Environment


ENVIRONMENTALLY SOUND RECONSTRUCTION


Download 0.78 Mb.
bet5/11
Sana18.03.2023
Hajmi0.78 Mb.
#1283149
1   2   3   4   5   6   7   8   9   10   11
Bog'liq
Environment

ENVIRONMENTALLY SOUND RECONSTRUCTION

  • Issue 2: Implementing environmentally sound reconstruction
  • Sub Issue 1 : Site selection
  • In the rush to provide transitional shelter to the thousands of homeless of Sri Lanka and southern India following the 2004 tsunami, authorities chose low-lying sites that later flooded during the monsoons
  • In Indonesia, permanent housing settlements were developed in flood plains and barricaded from the ocean by a sea wall that blocked the surface flow of water and regularly flooded the entire settlement
  • In the post-disaster setting the urgency to rebuild compounds the challenge of choosing appropriate sites.
  • Case 6: Fast track environmental assessment tool in Aceh
  • Lessons
  • The Indonesian Environment Ministry agreed to the fast-track assessment method.
  • The fast-track method cut the assessment time in half. When all the formalities had been dealt with, SLGSR workers and the environmental authority organized a public consultation with the nearby village community with nearly 300 people attending, to ensure public agreement before developing the waste site.
  • It took two years from the day the decision was made to develop a fast-track environmental impact assessment. By then, reconstruction work in Aceh had already progressed so far that the new method was only of use for some of the projects. Identifying or developing such a tool prior to a disaster, can expedite environmental assessments; speeding up recovery efforts while protecting important ecosystems

Download 0.78 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   10   11




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling