IEEE
MONITORING
ELECTRIC POWER QUALITY
Std 1159-1995
47
a complete working cycle (power period). In all cases, the data obtained is a snap shot of the power quality
proÞle. As
the environment changes, repeating the measurements is recommended. The updated (new) site
proÞle should be compared to the original. Site proÞles can be seasonally dependent as well.
7.5.3 Problem solving monitoring
Hunting for a power problem that exhibits a speciÞc equipment load malfunction can take days to weeks.
This type of activity is intended to Þnd the speciÞc power disturbance that creates the problem and document
its repeatability (similar to documenting a software bug).
Once the problem is found, a corrective action is
implemented. After implementation, power monitoring is conducted to ensure the
effectiveness of the solu-
tion and to verify that no new types of problems have been created.
Do'stlaringiz bilan baham: