Jinan biobase biotech co.,Ltd
Download 2.55 Mb. Pdf ko'rish
|
Паспорт ламинар бокс
- Bu sahifa navigatsiya:
- 6. Installation and Operation Instructions 6.1 Installation
- Note: The base part is placed at the back o f the laminar flow cabinet during transportation, and it
BIOBASG
5.6 Fuse The laminar flow cabinet is equipped with a power fuse, which is located on the side of the power cord outlet on the side of the box. For the corresponding specifications and models of the fuse, please refer to the section 9. Label description. 6. Installation and Operation Instructions 6.1 Installation a. Remove all packaging components. b. Check whether there are scratches, deformations or foreign objects on the outer surface of the host. c. Check the relevant accessories and information carefully according to the packing list of the accessories in the manual. d. Move the equipment near the final placement point and facilitate the installation position, prepare the S8 Allen wrench that needs to be used, and then proceed with the installation operation. Note: The base part is placed at the back o f the laminar flow cabinet during transportation, and it should be taken out before installation; it is strictly prohibited to move the laminar flow cabinet with the bottom facing upwards, and it is strictly forbidden to place or disassemble it. e. Assembly of base part Before assembling the base, please unscrew the M l0*55 hexagon socket head bolts in the cross brace and T-bracket. For the specific assembly process of the'base, please refer to the installation diagram of the base, as shown in Figure 3. Figure 3 10 B IO BAS6 f. Adjustment of Footmaster Caster i; Clockwise: lower the cabinet, move the cabinet Counterclockwise: increase the cabinet, tix the cabinet Figure 4 Please refer to Figure 4. Rotate the red part of the Fuma casters clockwise to lower the corresponding base feet, thereby reducing the height of the cabinet. When the four Fuma casters are lowered at the same time, the cabinet can be moved; Rotate the red part of the Fuma casters counterclockwise to raise the corresponding base feet to increase the height of the cabinet. When the four Fuma casters are raised at the same time, the cabinet can be fixed; The simultaneous adjustment of four Fuma casters can make the cabinet in a horizontal and stable state, g. The host is connected to the base Please refer to Figure 5 for the connection between the host and the base. To connect the host to the base, M l0*20 hexagon socket head bolts, flat washers 10, and spring washers 10 need to pass through the base from the bottom up to the host side plate to fix the host and the base firmly. M10 Flat washers M10 Spring washer (4pcs) Use bolts to connect the base and the host Figure 5 h. Placement of the equipment The laminar flow cabinet should be placed in a relatively stable indoor airflow area to reduce the impact of environmental factors such as ventilation system, air conditioning, doors, windows, and n BIOBASG personnel movement on the performance of the clean workbench; It is forbidden to place the laminar flow cabinet in a location that is difficult to cut off, and at least 300mm of space must be reserved on each side of the laminar flow cabinet for subsequent inspection and maintenance. Download 2.55 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling