Power Plant Engineering
Download 3.45 Mb. Pdf ko'rish
|
Power-Plant-Engineering
Fig. 11.12
Fig. 11.13 Underground Power House. The conven- tional hydro-electric power stations are usually lo- cated over-ground at the foot of a dam or a hill slope on the banks of a river. The first underground power station Nerayaz was built in 1897 in Switzerland. The high capacity underground power plants were built only after second world war. The idea of locat- ing powerhouse underground was suggested not only with the intention of protecting them against air raids but also technical and economical considerations were mainly considered. After second world war, the immunity against air attacks was unquestionably regarded as an important. advantage-of under- ground power station. A large number of underground power stations have been installed in U.K., U.S.A., Russia, Canada, Japan after second world war and recently in India also. In all, there are about 300 such stations in service with a total installed capacity of 31 million kW Fig. 11.15. Horizontal setting of Pelton wheel with penstock upto the end of 1963. Fig. 11.15 Head race Super structure Generator Prime mover Draft tube Tail box Screens Head race Steel Penstock Prime mover Tail race Draft tube Generator Super structure Super structure Alternator Tailrace Kaplan Turbine Guide vane Penstock Draft tube Crane Fig. 11.14 HYDRO-ELECTRIC POWER PLANTS 359 The considerations supporting the construction of underground power stations are stated below : 1. Non-availability of a suitable site for a conventional surface station and good slope for penstock. 2. Danger of falling rocks and snow avalanches particularly in narrow valleys. 3. Availability of underground sound rock and avoidance of a long pressure tunnel and facility for a convenient tail-race outlet. 4. Possibility of elimination of surge tank required for surface station due to long pressure tun- nel 5. The rugged topographical features and the difficulties in finding a suitable short and steep slope for pipe lines make it more economical to install the water conduit, the machine, trans- former hall and tailrace system underground. 6. Foundation costs for overground power house become excessive in case of poor quality sur- face layers. The construction of draft tube, spiral case and separating floors in loose weath- ered rock is again more expensive than the excavation of corresponding parts underground. The costs of underground machine hall are lower than those of the superstructure of a surface powerhouse of similar dimensions. Download 3.45 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling