7.7.2 Design
Stage Design Stage commissioning activities serve to assure that the owner’s proj- ect requirements for items such as energy efficiency, sustainability, indoor environmental quality, fire protection and life safety, etc. are sufficiently defined and adequately and accurately reflected in the contract documents. The Design Stage is the commissioning team’s opportunity to assure that building systems and assemblies as designed will function according to user expectations. Further, specific tests and procedures designed to verify the perfor- mance of systems and assemblies are developed and incorporated into the contract documents. 7.7.2.1 Incorporate Commissioning into A/E and CM Scope of Services GSA commissioning activities may be more rigorous than A/Es and CMs typically included in their scope of services. Design, construction, and post-construction commissioning activities must be defined and written into the architect/engineer and construction manager scopes of work and executed contracts. The History of Graphene 263 By this stage of project development, the GSA project manager must have an awareness of how commissioning services will be delivered. GSA’s preferred method for engaging a commissioning agent is to arrange for the construction manager to contract directly with a commissioning agent. However, there will be exceptions based on project specific drivers. Should the project team determine that the CM will contract the commissioning agent, this must be written into the CM’s scope of work. Commissioning services for design and construction management pro- fessionals shall minimally include, but are not limited to, the items listed on the following page. 7.7.2.1.1 Design Professional 1. Participate and aid in the documentation of the owner’s project requirements. 2. Document revisions to owner’s project requirements and obtain GSA approval. 3. Document the basis of design. 4. Integrate Cx process requirements and activities provided by the CxA into the contract documents. 5. Attend commissioning team meetings (three design review meetings and monthly construction stage Cx team meetings). 6. Specify and verify that the operation and maintenance of the systems and assemblies have been adequately detailed in the construction documents. Figure 7.3 Relationship between the commissioning cost and the building area. 50 $0.00 $1.00 $2.00 $3.00 Specialty Complex Moderate Simple 100 200 300 Estimates of construction phase commissioning costs Download 1.92 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling