Project Management in the Oil and Gas Industry
Instructor Qualifications
Download 1.92 Mb. Pdf ko'rish
|
2.Project management in the oil and gas industry 2016
- Bu sahifa navigatsiya:
- Table 7.10.
Instructor Qualifications
• The instructor shall have received specific training from the manufacturer regarding the inspection, testing, and mainte- nance of the system provided. The instructor shall train the government employees designated by the contracting officer in the care, adjustment, maintenance, and operation of the new facility equipment and systems. • Each instructor shall be thoroughly familiar with all parts of the installation. The instructor shall be trained in operating theory as well as practical operation and maintenance work. 7.7.3.7 Turnover Commissioning Record It is critical to understand that commissioning documentation is developed throughout the project and turned over before substantial completion. 278 Project Management in the Oil and Gas Industry Commissioning documentation turned over at this stage of the project is a result of a well thought out documentation plan and collection of informa- tion throughout all of the project phases. Table 7.10 outlines necessary documentation of the commissioning pro- cess by project phase in order to complete the commissioning. The Commissioning Record shall include a brief summary report that includes a list of participants and roles, a brief building description, over- view of commissioning and testing scope, and a general description of test- ing and verification methods. For each piece of commissioned equipment, the report shall contain the disposition of the CxA regarding the adequacy of the equipment, documentation, and training meeting the contract doc- uments in the following areas: Table 7.10. Commissioning record document. Document Phase Started Developed/Provided By Commissioning Plan Planning GSA PM Commissioning Plan Appendices A. Owner’s Project Requirements Planning GSA PM B. Basis of Design Design A/E C. Commissioning Specifications Design A/E/CxA D. Design Review Design CxA E. Submittal Review Design CxA F. Test Procedures Design CxA G. Issues Log Construction CxA H. Construction Checklists Construction CxA/Construction Contractor I. CxA Site Visit & Cx Team Mtg. Minutes Construction CxA J. O&M Review Construction CxA K. Training Documentation Construction CxA/Construction Contractor L . Warranty Review Construction CxA M. Test Data Reports Construction CxA/Construction Contractor Summary Report Construction CxA Recommissioning Management Manual Construction CxA/GSA PM The History of Graphene 279 1. Equipment meeting the equipment specifications 2. Equipment installation 3. Functional performance and efficiency 4. Equipment documentation 5. Operator training The Recommissioning Management Manual provides guidance and establishes timelines for recommissioning of building facilities systems and components. The format of the Recommissioning Management Manual will closely parallel the Commissioning Plan for the facility. Download 1.92 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling