Project Management in the Oil and Gas Industry
Table 7.12 Existing building system commissioning cost. Building type
Download 1.92 Mb. Pdf ko'rish
|
2.Project management in the oil and gas industry 2016
- Bu sahifa navigatsiya:
- Table 7.13
Table 7.12 Existing building system commissioning cost.
Building type Commissioning cost (USD in 1995) Annual savings (USD in 1995) Payback cost (years) Computer facilities/ office 24000 89758 0.3 High rise office 12745 8145 1.6 Medical institute 24768 65534 0.4 Retail 12800 8042 1.6 284 Project Management in the Oil and Gas Industry Table 7.13, noting that the cost saving is about $12,168 for 60,000ft 2 of manufacturing facilities. Quiz 1. Why is quality planned and not inspected? • It reduces quality and is less expensive. • It improves quality and is more expensive. • It reduces quality and is more expensive. • It improves quality and is less expensive. 2. What is meant by your product or service completely meets a custom- er’s requirements? • Quality is achieved. • The cost of quality is high. • The cost of quality is low. • The customer pays the minimum price. 3. All of the following are part of quality control EXCEPT? • Cost of quality • Inspection • Control charts • Flowcharting 4. A project is in progress and the project manager is working with the quality assurance department to improve stakeholders’ confidence that the project will satisfy the quality standards. Which is the gain from this process? • Quality problems • Checklists • Quality improvement • Quality audits Table 7.13 Annual energy and cost savings from commissioning existing building systems projects. Building type Energy savings Cost savings (USD in 1995) 22000 ft2 office 130800 KWh 7736 110000 ft2 office 279000 KWh 12447 60000ft2 high-tech manufacturing facility 336000 KWh 12168 The History of Graphene 285 5. While testing the strength of concrete poured on your project, you discover that over 35% of the concrete does not meet your company’s quality standards. You feel certain the concrete will function as it is and you don’t think the concrete needs to meet the quality level specified. What should you do? • Change the quality standards to meet the level achieved. • List in your reports that the concrete simply “meets our quality needs.” • Ensure the remaining concrete meets the standard. • Report the lesser quality level and try to find a solution. 6. A project manager says to a team member, “If you cannot complete this task according to the quality standards you set in place, I will remove you from the team that is going to Paris for the milestone party with the customer.” What form of power is the project manager is using? • Reward power • Formal power • Penalty power • Referent power |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling