Project Cost Control 123
Design 13%
Materials 38%
Fabrication 27%
Coating 10%
Erection 12%
From Figure (4.1), one can determine the
proportions of the cost of
main elements for constructing a steel structure. Every item has a percent-
age of the total cost.
We note from the above table that the connections, either through the
use
of welds or bolts, have the largest share in the process of preparing
detailed drawings, where the most important
and most dangerous phase is
the accuracy of the details of the connection.