41
4.3.6.2.2. Each turbo-generation unit with P
nom
150 МW, except for those that are able to
combine generation
of thermo and electric power, must have secondary control capability,
and the minimum control band to be provided is as follows:
- for turbo-generators using coal as fuel: control band above 0.15P
nom
;
- for turbo-generators using gas or oil as fuel: control band above 0.25P
nom
.
4.3.6.3. Tertiary control
4.3.6.3.1. All hydro-generators must have synchronization time to transmission grid less than
15 minutes.
4.3.6.3.2. All engines in pumping plants, i.e. hydro-generators
with reversible operation
capability, must have synchronization time to transmission grid less than 15 minutes (for both
operational regimes).
4.3.6.3.3. Each generator must have capability of operating under reduced generation of
active power. Minimum level of that generation, where the stable operation of the generator
is
guaranteed, so-called technical minimum, must meet the following values:
- for hydro-generators: P
min
≤ 0,45P
nom
;
- for turbo-generators using coal as fuel: P
min
≤ 0,7P
nom
;
- for turbo-generators using gas or oil as fuel: P
min
≤ 0.4P
nom
;
- for turbo-generators with a combined cycle:
for a gas turbine
P
min
≤ 0.4P
nom
, and for a steam turbine P
min
≤ 0.8P
nom
;
-
for
other types of generators P
min
≤ 0.8P
nom
.
Do'stlaringiz bilan baham: