Table of contents introduction


Sequence of operations when processing information


Download 263.72 Kb.
bet34/77
Sana22.11.2023
Hajmi263.72 Kb.
#1794484
1   ...   30   31   32   33   34   35   36   37   ...   77
Bog'liq
Тех процес 1 INGLIZCHA

12.9. Sequence of operations when processing information
about formed and dispatched trains



No.

OPERATIONS

Note


Enter 02 message about the formed composition. Receiving from the ASOUP the calculated TGNL according to certificate 21.





If necessary, enter a correction message 09

with codes 11 or 14


Transmission 200 of a train departure message





APPLICATIONS

Appendices 1. Instructional and technological map of the station duty officer

Appendix 2. Instructional and technological map of the operator with the station duty officer.

Appendix 3. Instructional and technological map of the duty officer at the hump.

Appendix 4. Instructional and technological map of the hump operator.

Appendix 5. Instructional and technological map of the DSPP of the departure park. Post No. 3

Appendix 6. Instructional and technological map of the DSPP of the arrival park. Post No. 4

Appendix 7. Instructional and technological map of the DSPP, depth of the sorting yard. Post No. 5

Appendix 8. Instructional and technological map of the train compiler.

Appendix 9. Instructional and technological map of the train receiver.


Download 263.72 Kb.

Do'stlaringiz bilan baham:
1   ...   30   31   32   33   34   35   36   37   ...   77




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling