12.9. Sequence of operations when processing information
about formed and dispatched trains
No.
|
OPERATIONS
|
Note
|
|
Enter 02 message about the formed composition. Receiving from the ASOUP the calculated TGNL according to certificate 21.
|
|
|
If necessary, enter a correction message 09
|
with codes 11 or 14
|
|
Transmission 200 of a train departure message
|
|
APPLICATIONS
Appendices 1. Instructional and technological map of the station duty officer
Appendix 2. Instructional and technological map of the operator with the station duty officer.
Appendix 3. Instructional and technological map of the duty officer at the hump.
Appendix 4. Instructional and technological map of the hump operator.
Appendix 5. Instructional and technological map of the DSPP of the departure park. Post No. 3
Appendix 6. Instructional and technological map of the DSPP of the arrival park. Post No. 4
Appendix 7. Instructional and technological map of the DSPP, depth of the sorting yard. Post No. 5
Appendix 8. Instructional and technological map of the train compiler.
Appendix 9. Instructional and technological map of the train receiver.
Do'stlaringiz bilan baham: |