REPUBLIC OF UZBEKISTAN 



 

MINISTRY OF AGRICULTURE AND WATER RESOUCES 

 

 

 

 

 

 

 

 

SOUTH KARAKALPAKSTAN WATER RESOURCES MANAGEMENT IMPROVEMENT 

PROJECT 

 

 



 

ADDENDUM TO THE ENVIRONMENTAL AND SOCIAL ASSESSMENT AND 

MANAGEMENT PLAN 

 

 



 

 

 

 

 

 

 

 

 

 

Tashkent, March 11, 2014 

E4155 V3 

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized



Background 

The Environmental Assessment and Management Plan (EAMP) has been prepared for the SKWRMIP in 

2013.  The  EAMP  duly  considers  potential  impacts  associated  with  the  implementation  of  the  project 

activities  on  the  rehabilitation  and  improvement  of  the  irrigation  and  drainage  practices  in  the  region. 

However,  the  issue  of  child  and  forced  labor  has  recently  been  raised  by  the  local  communities  and 

activists as the one widely introduced country-wide and causing serious concerns about human health and 

social  welfare  and  stability.  In  order  to  address  this  issue  under  the  project,  the  Bank  proposed  to  the 

Government of Uzbekistan an increase of the originally identified amount of the loan by 40 mln. USD. 

These funds are intended to be spent, via Component 2 of the project, for the implementation of a set of 

measures aimed at scaling up crop diversification and intensification, and cotton harvest mechanization. 

The  latter  would  include  the  following:  (i)  purchase  of  cotton  harvesters,  supplemental  drying,  pre-

cleaning and cleaning equipment for three cotton ginneries located in the districts of Beruni, Turtkul and 

Elikkala, seeders; (ii) three year supply of diesel and lubricants; (iii) adoption of crop husbandry methods 

that  are  appropriate  for  cotton  mechanization,  such  as  preparation  for  harvest  by  using  defoliants  to 

increase the intensity of cotton leaves fall; (iv) training of farmers and ginnery staff as appropriate on crop 

husbandry methods, including use of defoliants, and appropriate use of the equipment to be purchased. It 

is expected that the proposed measures will help mechanize up to 70 % of the project area, including the 

districts of Beruni, Turtkul and Elikkala totaling to 35,550 ha (see Fig. 1 and Fig. 2 below). Although the 

project  will  not  support  the  supply  of  defoliants,  the  introduction  of  cotton  mechanized  harvesting  is 

associated with an increased use of those. The defoliants will be spread/sprayed by tractors. 

 

Figure 1. SKWRMIP Project area with the current irrigation and drainage network 



 

Figure 2. Project area 

The mechanized cotton harvesting, including supply and use of defoliants is governed by the Law of the 

Republic of Uzbekistan on the Pest Management and Protection, No. 116-II dated August 31, 2000, and 

associated regulations and manuals.  

While overall impacts of the above activities are expected to be positive, the implementation is associated 

with  certain  environmental  risks  which  require  duly  consideration  and  mitigation.  The  additional  EMP 

below is summarizing the anticipated impacts, mitigation measures and institutional responsibilities: 



Additional Environmental Management Plan 

Potential Impact 

Mitigation Measure 

Implementation 

responsibility 

Cost

1

 

 

Use of cotton harvest machinery 

 

Soil compaction 

 

The  number,  weight  and  daily 



and  seasonal  intensity  of  the 

machinery 

should 

be 


in 

accordance 

with 

local 


regulations 

on 


technical 

characteristics 

of 

locally 


PIU, cotton harvesters 

users 


N/A 

 

 



 

 

 



                                                           

1

The cost of monitoring is incorporated into the project overall environmental monitoring budget specified in the 



main ESA/ESMP (2013)

 


manufactured 

cotton 


harvest 

machinery

2





 

Training  to  be  delivered  to 

beneficiary 

farmers 


on 

sustainable  operation  of  the 

machinery, which minimizes soil 

compaction impact 

 

 

10,000$ 



Dust generation 

To the possible extend, avoid using 

the machinery in windy days  

PIU, cotton harvesters 

users 

N/A 


Noise 

and 


vibration  

 



Use  of  technically  advanced 

machinery, 

with 

required 



parameters  to  be  indicated  in 

relevant 

Technical 

Specifications;  

 

Appropriate maintenance



 

Established  working  hours  to  be 



strictly  obeyed  (9am  –  6pm)  as 

per the local regulations 

PIU, cotton harvesters 

users 


N/A 

 

 



 

 

N/A 



N/A 

Risk 


of 

contamination  of 

soil  and  surface 

water  by  leaking 

fuels 

and 


lubricants 

 



Site 

for 


car 

washing 


and 

maintenance  to  be  confined, 

gravel  or sand  covered  and  have 

three 



chamber  tank 

for 


collection  and  separation  of 

waste and oily water; 

 

Vehicles  to  be  fuelled  on  a 



confined site at least 500 m from 

any water body or canal 

PIU, cotton harvesters 

users 


3,000$ 

 

 



 

 

 



N/A 

Use of cotton cleaning ginnery equipment 

 

Dust generation 



Regular  water  spraying  at  ginnery 

facilities 

PIU, ginnery staff 

N/A 


Noise & vibration 

 



Use  of  technically  advanced 

equipment, 

with 

required 



parameters  to  be  indicated  in 

relevant 

Technical 

Specifications;  

 

Appropriate maintenance; 



 

Established  working  hours  to  be 



strictly  obeyed  (9am  –  6pm)  as 

per the local regulations 

PIU, ginnery staff 

N/A 


 

 

 



 

N/A 


N/A 

Generation 

of 

solid  wastes  of 



organic origin as a 

result  of  cotton 

processing 

Where  possible,  re-use  and/or 

recycling  of  generated  organic 

wastes 


PIU, ginnery staff 

10,000$ 


needed 

for 


additional 

recycling 

equipment 

Generation 

of 

waste  water  as  a 



 

Ginnery facilities to be equipped 



with  special  concrete  chambers 

PIU, ginnery staff 

2,000$ 

 

                                                           



2

Weight not to exceed 3800 kg, number per ha not to exceed 4, continuous use of machinery not to exceed 8 hours 

per day

 


result  of  cotton 

cleaning 

of collection of waste water; 

 



Local  communal  services  are 

contracted  to  regularly  remove 

and  dispose  the  waste  water  as 

prescribed by local executive and 

environmental authorities 

 

10,000$ 



Supply of diesel and lubricants 

 

Risks  of  fires  and 

pollution  of  soil 

and  surface  water 

during 

transportation  and 



storage  of  fuel 

and lubricants 

 

Storage  of  fuel  and  lubricants  in 



special impermeable tanks; 

 



Storage  sites  to  be  bounded  and 

gravel or sand covered; 

 

Spills 



to 

be 


immediately 

removed 


and 

separately 

disposed; 

 



Sorbent  materials  available  on 

site  to  contain  and  clean    up 

small spills 

 



Fire  fighting  equipment  (fire 

extinguishers, 

reliable 

water 


source,  other  related  equipment) 

to be present at all sites at easily 

accessible  locations,  and  staff  to 

be  designated  and  trained  on 

security procedures; 

 



Fuels  and  lubricants  to  be 

transported 

in 

specialized 



vehicles; 

 



Sites  for  fuelling  the  machinery 

have to be 500 m from any water 

body  and  agreed  with  local 

executive 

and 

environmental 



authorities 

PIU, 


users 

of 


machinery 

and 


equipment  at  farms 

and ginneries 

N/A 

 

2,000$ 



 

N/A 


 

 

N/A 



 

 

3,000$ 



 

 

 



 

 

 



 

10,000$  might  be 

needed 

to 


rent 

specialized 

vehicles 

 

N/A 



Storage and use of defoliants 

 

Human health risk 

 

 

 



 

 

 



 

 

 



 

The  defoliants  which  are  likely 



to  be  used  by  farmers  for  the 

preparation 

of 

fields 


for 

mechanized  cotton  harvest  are 

limited  to  those  registered  in 

Uzbekistan

3

  as  specified  in 



Annex  2.  Any  other  types  of 

defoliants are forbidden for use; 

 

Aerial  and  manual  spraying  are 



strictly prohibited;  

PIU,  contractors  or 

farmers 

responsible 

for 

harvest 


preparation 

N/A 


 

 

 



 

 

 



 

 

 



                                                           

3

A Manual prepared and annually updated by the State Chemical Commission established under the MAWR by the 



Decree of the Cabinet of Ministers in accordance with the Law On Pest Management No. 116-II of 08/30/2000, and 

also comprising Uzbek Chemical Industry State Joint Stock Company, Uzbek Agriculture Scientific Development 

and Production Center  and Uzbek Cotton Research Institute

 


 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 



The daily norm for the area to be 

treated  by  sprayed  defoliant  not 

to  exceed  4.4  ha/day  per  one  set 

of equipment

4





 

Direct  eye  and  skin  contact 

should  be  avoided.  Use  of 

respiration  masks  when  working 

with defoliants 

 



Use proper PPE 

 



 

Repackaging  into  sprayers  to  be 

conducted  in  isolated  and  well-

ventilated premises 

 



 



Ensure  that  workers  and  local 

residents are downwind from the 

powder mixing activities  

N/A 


 

 

 



N/A 

 

 



 

25,000$  cost  of 

PPE 

10,000$  cost  of 



the  isolated  and 

ventilated 

facilities 

 

N/A  



Fire and explosion 

in storage   

 

Security 



procedures 

to 


be 

established; 

 

Firefighting  equipment  to  be 



present  at  all  sites  at  easily 

accessible  locations,  and  staff  to 

be  designated  and  trained  on 

security procedures; 

 

Fuels and lubricants to be stored 



away from ammonium nitrate  

 

 



Soil 

contamination 

 

Use of defoliants to be strictly in 



accordance  with  relevant  labels 

specifying  dosage,  method  of 

application etc.;  

 



Storage  of  defoliants  to  be  in 

accordance  with the Manual  and 

defoliant  specific  requirements 

specified  on  labels;  storage 

facility  floor  to  be  made  of 

concrete 

 

Soil to be monitored quarterly to 



detect  and  make  sure  residual 

concentrations  are  within  the 

allowable limits 

PIU,  contractors  or 

farmers 

responsible 

for 

harvest 


preparation 

 

 



 

 

 



 

 

PIU,  with  assistance 



of specialized labs 

N/A 


 

 

 



5,000$ 

 

 



 

 

 



 

5,000$ 


Surface 

and 


ground 

water 


contamination 

 



Storage  of  defoliants  to  be  at 

least  500  m  far  from  the  nearest 

water  body,  irrigation  channel 

etc.; 


PIU,  contractors  or 

farmers 


responsible 

for 


harvest 

preparation 

 

N/A 


 

 

 



 

                                                           

4

No unused defoliants are anticipated as they are distributed in strict accordance with the established norms under 



the supervision of district level expert commission under MAWR 

 


 

 



Defoliants  to  be  stored  in 

specialized  ventilated  premises 

in isolated containers 

 

 



 

3,000$ 


 

 

2,000$  



Contingency expenses 

TOTAL 

 

 

 

 



100,000$ 

 

Implementation Arrangements 

Implementation  arrangements  remain  similar  to  those  specified  in  the  Environmental  Assessment  and 

Management  Plan.  The  Project  Implementation  Unit  bears  overall  responsibility  for  the  project 

compliance  with  this  additional  EMP.  A  dedicated  environmental  consultant  will  be  contracted  by  the 

PIU on a full time basis to advise the farmers as needed and ensure the implementation of the additional 

EMP. 

Capacity Building 

The project will support building capacity among the farmers and population through a training program 

to be developed and customized to cover the following topics: 

-

 



Safe use and maintenance of cotton harvest machinery. Good practices to avoid and minimize soil 

compaction impacts. Principles of environmental management; 

-

 

Safe storage and use of defoliants, field preparation. Principles of environmental management; 



-

 

Safe  use  and  maintenance  of  ginnery  equipment.  Training  of  ginnery  staff  on  improved 



arrangements for harvesting (unloading and transportation of cotton to the ginneries); 

-

 



Introduction of new seed varieties. Adjustments at planting stage, including choice of appropriate 

cotton variety, ensuring needed distance between rows, row makers, seeding. Practices of cotton 

cultivation (thinning, topping). 

The  training  program  should  be  delivered  during  the  first  year  of  project  implementation,  before  the 

commencement  of  the  above  activities  on  crop  diversification  and  support  to  cotton  harvest 

mechanization. A consultancy company will be contracted by the Project Implementation Unit to develop 

the training program and required materials, and deliver the training sessions. 

Public Consultations 

The  Addendum  to  the  EAMP  has  been  discussed  at  the  public  consultation  meeting  held  on  March  4

th

 

2014, at the meeting hall of Beruni local governerate office  locaed within the project area. The meeting 



was  attended  by  the  representatives  of  local  farmer  communities,  executive  authorities,  local 

environmental agencies and NGOs. The detailed minutes of the public consultations are enclosed below 

in Annex 1. 


Annex 1 

Minutes of Public Consultations 

 

Name / Position 

Question / Comment 

Answer 


Yusupbaev 

Mahsud  (LABAIS 

First deputy) 

Will the 230 cotton picking machines be 

used  only  in  the  Project  area  or  whole 

Karakalpakstan? 

The  number  of  the  proposed  equipment 

has  been  calculated  for  three  project 

districts and they will be used only in the 

Project area.  

Abdullaev 

Muminboy 

(Ginnery head) 

The 


cotton 

picking 


machine 

manufactured  in  Uzbekistan  is  more 

convenient  since  its  tractor  can  be  used 

for  other  purposes  after  cotton  picking 

season. 

The World Bank experts have studied all 

the  alternatives  and  the  discussions  on 

the type of equipment and the method of 

procurement will be finalized during the 

Project  Appraisal  Mission  which  will 

take place next week. 

Kazakbaev  Oybek 

(Beruni AIS Head) 

It  should  be  admitted  that  the  scale  of 

this  proposal  is  amazing.  However  in 

order to reach the ultimate goal, farmers’ 

interest  should  be  increased  and  their 

opinions should be taken.  

The purpose of this meeting is to inform 

all  the  stakeholders  including  the 

farmers. Therefore we would like to ask 

the  present  attendants  to  convey  the 

highlights  of  this  meeting  to  farmers 

who  could  not  participate  today. 

Moreover  during  the  implementation  of 

the  Project,  there  will  be  mass  media 

campaigns to inform the public about the 

Project.  

Ruzimov  Olimboy 

(Navoi 


WUA 

Chairman) 

Some  farmers  in  the  Project  area  were 

also  planning  to  buy  such  machinery 

however  as  they  are  paying  astronomic 

bills for  electricity  due  to pumping  they 

could  not  effort  to  do  so.  It  is  excellent 

that  the  Project  will  not  only  avoid  the 

need  for  pumping  by  supplying  gravity 

irrigation but also introduce mechanized 

cotton harvesting. 

SKWRMIP is planned to supply gravity 

irrigation  to  the  Project  area.  Moreover 

there  will  be  training  and  capacity 

building activities. In command zones of 

pilot canals, complete on-farm and field 

level  works  will  also  implemented 

which  will  complete  whole  I&D 

network  starting  from  main  conveyance 

canal to main collector. 



Name / Position 

Question / Comment 

Answer 

Kutimov 


Zafar 

(District 

AWR 

Department 



Specialist) 

As far as understood, the machinery will 

be  under  the  balance  of  the  ginneries. 

We  believe  that  this  is  a  very  correct 

choice  since  it  is  very  difficult  for  the 

WUAs  to  operate  them.  On  the  other 

hand  in  case  they  are  handed  over  to 

MTPs  most  of  the  farmers  may  not  pay 

to  MTPs  for  their  services  on  time. 

However it is very easy for the ginneries 

to  take  their  service  fees  from  the 

farmers.  

As  already  stated  above,  all  these 

alternatives  have  been  studied  by  the 

World  Bank  experts  together  with 

relevant  local  organizations  in  order  to 

develop a sustainable model.  

Matchanov  Husan 

(Biybozor 

WUA 


Chairman) 

Is it possible to procure crawled tractors 

for  the  farmers  who  are  located  on  the 

marginal lands located at the outer zones 

of the Project area? 

As  already  stated,  the  main  purpose  of 

inclusion  of  this  additional  fund  is  to 

avoid  child  and  forced  labor  and  hence 

the  proposals  have  been  identified  with 

this  goal  in  mind.  However,  there  is 

another  project  component  under  which 

set 



of 

agro-hydro-melioration 

equipment  will  be  procured.  It  is 

expected  that  the  list  will  be  finalized 

during the Project Appraisal mission. 

Sanarbaev 

Muzaffar  (AWRD 

Head) 


What  does  the  project  aim  from  crop 

diversification. 

In  parallel  with  the  overall  Government 

strategy, the project aims to develop the 

most  optimal  crop  pattern  which  will 

allow the best use limited resources and 

maximize  the  benefits.  Project  will 

demonstrate modern techniques for other 

crops as well. Moreover it is planned to 

include the three project districts in other 

WB  projects  (RESP-II  and  Horticulture 

Development Project) aiming to develop 

horticulture and cold storage.  

 

 

 

 

 


List of attendants 

№ 

Name 

Place of work 

Position 

Yusupbaev Mahsud 



LABAIS 

First Deputy 

Khidirbaev Atabay 



District WUA 

Chairman  

Turabaev Oybek 



Jumaniyozov WUA 

Chairman 

Shukurboev Holmurod 



Makhtumkuli WUA 

Chairman 

Yuldashev Rashid 



Guliston WUA 

Chairman 

Nurullaev Shuhrat 



Reclamation Beruni distr. 

Head 


Kazakbaev Oybek 

AIS

5

 Beruni  



Head 

Radjapov Sadulla 



Ozod WUA 

Chairman 

Khudoberganov Kuylimjoy 



Chemistry Beruni distr.  

Deputy head 

10 

Ruzimov Olimboy 



Navoi WUA 

Chairman 

11 

Kutimov Zafar 



District AWR Department  

Specialist 

12 

Masharipov Komil 



District AWR Department 

Specialist 

13 

Tajiev Bakhtiyor 



District AWR Department 

Specialist 

14 

Matchanov Husan 



Biybozor WUA 

Chairman 

15 

Nizamatdinov Golim 



Кazakyap WUA 

Chairman 

16 

Saytmambetov Rahmatullo 



Beruniy-Nayman WUA 

Chairman 

17 

Jollibekov Murat 



State Committee for Nature 

Expert 


18 

Derbisaliev Murat 

Beruniy-Nayman WUA 

Chief specialist 

19 

Alimov Muhammad 



AIS Ellikkala 

Deputy head  

20 

Sanarbaev Muzaffar 



AWRD

6

 



Head 

21 


Serjanov Niyatboy 

ММТP 


Deputy head 

22 


Jumanazarov Sultanboy 

Agriculture chemistry 

Head 

                                                           



5

 Administration of Irrigation Systems 

6

 Agriculture and Water Resources Department 



23 

Abdullaev Muminboy 

Ginnery 

Head 


24 

Yuldashev Davron 

КК HGME  

Engineer 

25 

Mirzakulov Komil 



Ecology 

Inspector 

26 

Muminov Shavkat 



WUA 

Head 


27 

Sharipov Gayrat 

Buston WUA 

Head 


28 

Khudoyberganov Ibrosh 

WUA 

Head 


29 

Avedov Istam 

Amirobod WUA 

Head 


30 

Polvonov Ilhom 

Jayhun WUA 

Head 


31 

Ruzimbetov Alliyor 

Jayhun sohili WUA 

Head 


32 

Karimov Ibadulla 

Suv gavhari WUA 

Head 


33 

Khidirbaev Atabay 

Beruni distr. WUA 

Engineer- hydrotechnician  

34 

Turabaev Oybek 



К. Jumaniyozov WUA 

Agronomist 

35 

Jumatov Zaripbay 



Shobboz WUA 

Hydrotechnician 

36 

Ruzimov Olimboy 



Alloma Navoi WUA 

Mechanical engineer 

37 

Yuldashev Rashid 



Gulistan WUA 

Accountant 

38 

Nurimbetov Turebay 



Kiyatobod WUA 

Engineer 

39 

Radjapov Sadulla 



Ozod WUA 

Veterinarian 

40 

Shukurbaev Kholmurod 



Makhtumkuli WUA 

Hydrotechnician 

41 

Nihametdinov Beret 



Ozod-Kozok-yab WUA 

Hydrotechnician 

42 

Esnazarov Muratbek 



Ulugbek WUA 

Agronomist  

43 

Seitmambetov Rahmatulla 



Beruniy WUA 

Hydrotechnician 

44 

Matchanov Husan 



Biybazar WUA 

Mechanical engineer 

45 

Aytimov Seydabulla 



Оltinsoy WUA 

Hydrotechnician 

46 

Аrishev Jaras  



Yangiobod-Nayman WUA 

Agronomist 

47 

Taganmuratov M А 



Turtkul AWRD

 

Head 



48 

Sadullaev Abdurahmon 

Turtkul AWRD

 

Deputy head 



49 

Atabaev Ravshanbek 

Turtkul Oq oltin HJ

 

Head 



50 

Saburov Sirojiddin 

Turtkul Oq oltin HJ

 

Department head 



51 

Nurimbetov Mammatsapa 

Turtkul agriculture chemistry

  

Head 



52 

Ibragimov Salomaddin 

Turtkul agriculture chemistry

  

Specialist 



53 

Sultonboev Bahtiyor 

PAN-ISA Turtkul dept.  

Head 


54 

Matchanov Bahodir 

PAN-ISA Turtkul dept.  

Specialist 

55 

Kutlimuratov Marat 



PAN-ISA Turtkul dept.  

Specialist 

56 

Nurimov Ikrom 



PAN-ISA Turtkul dept.  

Department head 

57 

Ruzumov Azimboy 



Turtkul district WUA 

Chairman 

58 

Arazmatov Pulat 



Miskin WUA  

Manager 


59 

Arazov Avazgeldi 

Miskin WUA 

Chief Accountant 

60 

Saparov Egamberdi 



Amu-Uzbekiston WUA 

Manager 


61 

Hudaybergenov Davlat 

Amu-Uzbekiston WUA 

Chief Accountant 

62 

Klichev Yusupbay 



Buzyop WUA 

Manager 


63 

Rozimov Holmurot  

Shurahon WUA 

Manager 


64 

Matyakubov Hamid 

Shurahon WUA 

Chief Accountant 

65 

Bekchanov Sheripboy 



Amirobod-Turtkul WUA 

Manager 


66 

Reyimbaev Anvar 

Amirobod-Turtkul WUA 

Chief Accountant 

67 

Sultanov Jumaniyaz 



Ullibog-Gavhari WUA 

Manager 


68 

Bobojonov Shukrillo 

Bagyap-Turtkul WUA 

Manager 


69 

Atajanov Mahsud 

Bagyap-Turtkul WUA 

Chief Accountant 

70 

Ayanboev Turabek 



Kuhna-Kelteminar WUA 

Manager  

71 

Durdiev Ayitboy 



Kuhna-Kelteminar WUA 

Chief Accountant 

72 

Holliev Bayram 



Toza-Kelteminar WUA 

Manager 


73 

Durdieva Gulzor 

Toza-Kelteminar WUA 

Chief Accountant 

74 

Egamberdiev Shavkat 



Kumbaskan-Yanbosh WUA 

Manager 


75 

Ashirov Murot 

Kumbaskan-Yanbosh WUA 

Chief Accountant 

76 

Atabaev Umar 



Yanbash WUA 

Manager 


77 

Sattarov Hakimboy 

Yanbash WUA 

Chief Accountant 

78 

Boyjonov Tuyli 



Kukcha WUA 

Manager 


79 

Bektukaev Nurpeis 

Kukcha WUA 

Chief Accountant 

80 

Nazarov Gurban 



Pahtaobod-Navruz WUA 

Manager  

81 

Kurbandurdiev Gurban 



Pahtaobod-Navruz WUA 

Chief Accountant 

82 

Saparov Alisher 



Oq oltin Navruz WUA 

Manager 


 

 

Annex 2 

 

List of defoliants allowed for use in Uzbekistan   

(as per the Manual on the Use of Defoliants, 2013) 

 

1.



 

Super Magnesium chlorate Mg(ClO3)2 Liquid (ХМД) 

2.

 

PolyDEF: Super Magnesium chlorate Mg(ClO3)2 Liquid (ХМД) +  Na carboxymethyl cellulose 



Na [C6H7O2(OH)3-x (OCH2COOH)x]n 

3.

 



UzDEF: magnesium chlorate, carbamide, ammonium nitrate, acetateethanolamin.   

 

 