Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut
University Ridge at East Stroudsburg University
Building Name: University Ridge at East Stroudsburg Building Owner: University Properties Inc. Building Developer: Capstone Development Corp. Architect: Design Collective Inc. Engineers: Greenman-Pedersen Inc.
Location: East Stroudsburg, PA on the East Stroudsburg University Campus Building Statistics: - Student Residence – Apartments
- 541 Beds – 136 Units
- 3 stories plus an occupied walk in basement
- 140,000 square feet – 10 Buildings
- Development Cost: $27,200,000
- Construction Cost: $15,750,000
- Construction: August 2004 – August 2005
Heating System: - Hot water coil duct furnaces – Dedicated unit for each housing unit
- Hot water supplied by a dedicated residential hot water heater
- Electric unit heaters for unoccupied spaces.
Combined Heat & Power Goals: - Reduce emissions while increasing overall fuel usage for producing power
- Provide space heating using waste heat from power production
- Provide chilled water with absorption cooling which utilizes the waste heat from power production
- Reduce fossil fuel usage
- Determine feasibility of a payback period
- Decrease annual operating cost
Do'stlaringiz bilan baham: |