Development: The structured process of comparing, modifying, selecting, and optimizing through analyses, demonstrations, inspections, and/or tests, to meet a requirement


Download 154.5 Kb.
bet3/10
Sana28.12.2022
Hajmi154.5 Kb.
#1020411
1   2   3   4   5   6   7   8   9   10
Bog'liq
cg1397 Suspension SOR AppG2 GEM FRT Strut

Description of Documentation

Required Format Content and/or Details

Required Timing for Availability/Completion

GM Approval Required

Submit ADV Documentation to:

VCRI@QRP
(Section 4.2 of Tech. Spec.)

GMW3600, Section 3.2 & 3.2.1.1

with Quote Response Package (QRP)

No

GM AP Buyer
GM Lead Engineer

DFMEA@QRP (analysis portion)

GMW3600, Section 3.3.2.1

with Quote Response Package (QRP)

No

Available for GM review upon request

Supplier ADV Plan @QRP

GMW3600, Section 3.4.2.2

with Quote Response Package;
Selected supplier shall send a copy to GM Validation Engineer one week after source selection

No

GM AP Buyer

GM Validation Engineer



Initial Component Environmental (ENV) Test Plan

Appendix G2, Section 3.4.1 & GMW3172

with Quote Response Package; Selected supplier shall send a copy to GM Validation Engineer one week after source selection,

No



GM Validation Engineer

ENV design review

GMW3172

2 weeks after supplier Sourcing

No

GM ENV Engineer

DV ENV (GMW3172) Test Plan

GMW3172 & Appendix G2 Section 3.4.1

Initial test plan submitted 6 weeks after Supplier Sourcing,
Final DV ENV (GMW3172) test plan submitted to CEMENT prior to 10 weeks after Supplier Sourcing, but at least 10 business days prior to the start of any testing.

Yes

CEMENT database

EMC design review

GMW3103/3097

6 Weeks after Supplier Sourcing not to occur less than 100 days before the start of DV testing, at least 2 weeks prior to hardware design freeze.

No

GM EMC engineer


Download 154.5 Kb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   10




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling