Birds Protection Plan, which will provide the detailed timings, scope and 
methodology for pre-construction nest-searching in the appropriate seasons and 
locations; nests for Tier 1 species will be protected in-situ and no construction works 
will be allowed throughout the duration of the breeding season within 500m of the 
nests.
 
In addition, the erection of turbines will not be undertaken for any WTGs within 
750m of active Tier 1 nests and will be delayed until the nests have been vacated. 
 
Restore temporary laydown areas and buffer zones post construction with native 
vegetation and re-seeding with native flora. The detailed methodology for timing
scope, and methods will be prepared in the Restoration Action Plan. 
With the above measures, the residual significance is presented in the following table.
Table 7-25 Residual Significance of General Disturbance
R
ECEPTOR
 
V
ALUE
/
 
S
ENSITIVITY
 
M
AGNITUDE
 
R
ESIDUAL
 
Endangered Birds
Very High 
Minor 
Moderate to 
Major 
Threatened Birds
High 
Minor 
Minor to 
moderate 
Nationally Threatened Birds
Medium 
Minor 
Minor 
Non-threatened Birds
Medium 
Minor 
Minor 
Threatened Mammals
High 
Minor 
Minor to 
moderate 
Nationally Threatened Mammals
Medium 
Minor 
Minor 
Non-threatened Mammals (Carnivores) 
Low / Lower 
Minor 
Negligible to 
minor 
Non-threatened Mammals (Non-
carnivores) 
Low / Lower 
Minor 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   175   176   177   178   179   180   181   182   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling