Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
85
Figure 2-34 WTG Siting Considered in March 2021
Figure 2-35 WTG Siting Considered in May 2021
Analysis of the herpetological surveys results, showed that some of the WTGs in the May 2021
layout were located within the Southern-Even
Fingered Gecko habitat;
a critically
endangered and endemic species vulnerable to habitat loss. As such, the WTG locations were
relocated in November 2021 and the number of turbines reduced from 125 WTGs to 79 WTGs
in order to avoid the critical habitat.
Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
86
Figure 2-36 WTG Siting in November 2021
Figure 2-37 Overlay of WTG Siting Considered in March, May and November 2021
Showing Difference in WTG Location
Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
87
2.8.5
33/500kV Substation Location
The 33/500kV substation is part of the Project’s electrical connection facility to aid connection
of the Wind Farm to the grid. In June 2021, the substation was proposed to be located within
the eastern plot in proximity to the existing road that runs from west of the plot boundary to
the north & north-eastern extent.
During some ecological
surveys at the Project site, it was identified
that the proposed
substation was located within the Southern-Even Fingered Gecko habitat; a critically
endangered and endemic species vulnerable to habitat loss. An Environmental &
Social
Constraint study was conducted by 5 Capitals in August 2021 and it was recommended that
the substation be moved to the north or south of the proposed location as there is flat terrain
available in those areas and this would relocate the substation out of identified gecko habitat.
Technical studies were undertaken by Juru Energy as part of the OHTL Pre-Feasibility study on
behalf of ACWA Power and a new substation location was proposed in September 2021 taking
into consideration the environmental recommendations from the E&S Constraint study to utilise
land outside of identified suitable gecko habitat.
The location of the 33/500kV substation in June 2021 and
the final proposed location
(September 2021) are presented
in the figures below