Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 161 E QUATOR P RINCIPLES G UIDANCE ON I MPLEMENTATION OF THE E QUATOR P RINCIPLES D URING THE C OVID -19 P ANDEMIC The guidance recommends that the borrower should consider the following in the engagement of workforce and management of risks: Engagement of Workforce Communicate its approach to COVID-19 management to its workforce (including contractors) and provide information and advice about the virus. Engagement methods should ensure the ability to provide frequent updates with a central information communication network that allows workers to access all the latest information and guidance. Consider the need for a 24-hr hotline. Design communication in a way that avoids risks of stigma associated with infection in line within available good practice. Managing Health Risks It is recommended that the borrower shall develop a range of actions/procedures to manage workers risks. These procedures must align with the latest guidance/requirements at national/regional levels and WHO guidelines. It should also ensure that up to date information is maintained at the Project level and liaise with national/local authorities as applicable. Welfare and Livelihoods Where travel restrictions lead to workers remaining on site for longer rotations, fatigue management procedures are recommended. The following measures are also recommended in instances where workforce reduction maybe required: Consultation with workers/representatives during the entire process of evaluating viable options. Options for avoiding redundancy should be considered in the first instance (e.g. paid/unpaid leave, reduced hours/pay) with retrenchment taken as the last option. Reduction in workforce should be undertaken incrementally where possible and regularly reviewed. Consideration should also be given to risks posed to vulnerable workers i.e. casual workers, woman, workers with childcare issues, supply-chain workers and their needs and support provided as required. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 162 Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling