Dzhankeldy Wind Power Project


Download 6.64 Mb.
Pdf ko'rish
bet1/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
  1   2   3   4   5   6   7   8   9   ...   203
Bog'liq
56086-001-esia-en



Draft Environment and Social Impact Assessment 
Project Number: 56086-001 
March 2022 
Uzbekistan: ACWA Power Dzhankeldy Wind Project 
Part 1: Main Report 
Prepared by ACWA Power for the Asian Development Bank. 
This draft environment and social impact assessment is a document of the borrower. The views 
expressed herein do not necessarily represent those of ADB's Board of Directors, Management, 
or staff, and may be preliminary in nature. Your attention is directed to t
he “
terms of use
” section 
of ADB’s website. 
In preparing any country program or strategy, financing any project, or by making any designation 
of or reference to a particular territory or geographic area in this document, the Asian 
Development Bank does not intend to make any judgments as to the legal or other status of any 
territory or area. 


Dzhankeldy 500MW Wind Farm 
Republic of Uzbekistan 
Environmental & Social Impact 
Assessment (ESIA) 
Volume 2- Main Text, Tables & 
Figures 
Prepared for: 
March 2022


5 Capitals Environmental and Management Consulting 
Principal office: PO Box 119899 Sheikh Zayed Road, Dubai, UAE 
+971 4 343 5955
+971 4 343 9366 
D
OCUMENT 
I
NFORMATION
P
ROJECT 
N
AME
 
Dzhankeldy 500MW Wind Farm
5C

P
ROJECT 
N
UMBER 
 
1305/001/102
D
OCUMENT 
T
ITLE
 
Environmental and Social Impact Assessment (ESIA) Report: 
Volume 2 
– Main Text, Tables & Figures

Download 6.64 Mb.

Do'stlaringiz bilan baham:
  1   2   3   4   5   6   7   8   9   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling