Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
C
LIENT ACWA Power 5C S P ROJECT M ANAGER Eva Muthoni Oberholzer 5C S P ROJECT D IRECTOR Ken Wade I SSUE AND R EVISION R ECORD V ERSION V ERSION D ATE D ESCRIPTION A UTHOR R EVIEWED A PPROVED 1.0 17/12/2021 ESIA-Volume 2 EFO/NM/EMO MKB/KRW KRW 1.1 11/01/2022 Updates based on ACWA Power’s comments EFO MKB AJJB 1.2 27/02/2022 Updates based on ADB comments EFO/SB KRW AJJB 1.3 23/03/2022 Updates based on ADB comments SB/ST EMK/KRW AJJB 1 Financial Capital Regardless of location, mode of delivery or function, all organisations are dependent on The 5 Capitals of Sustainable Development to enable long term delivery of its products or services. Sustainability is at the heart of everything that 5 Capitals achieves. Wherever we work, we strive to provide our clients with the means to maintain and enhance these stocks of capital assets. 2 Social Capital 3 Natural Capital 4 Manufactured Capital 5 Human Capital D ISCLAIMER 5 Capitals cannot accept responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from the party which commissioned it. This document is issued for the party which commissioned it and for specific purposes connected with the above-identified project only. It should not be relied upon by any other party or used for any other purpose Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures i C ONTENTS 1 I NTRODUCTION ____________________________________________ 1 1.1 The Project ________________________________________________________ 2 1.2 Background & Scope of the ESIA Report ____________________________ 3 1.2.1 Environmental and Social Scoping Report ________________________________ 3 1.2.2 National EIA (OVOS) ____________________________________________________ 4 1.2.3 Lenders ESIA ____________________________________________________________ 5 1.3 Objectives of the ESIA______________________________________________ 5 1.4 Structure of the ESIA _______________________________________________ 6 1.5 Key Project Information ___________________________________________ 10 2 P ROJECT I NFORMATION ____________________________________ 11 2.1 Project Location __________________________________________________ 11 2.1.1 Wind Farm _____________________________________________________________ 11 2.1.2 Overhead Transmission Line _____________________________________________ 14 2.2 Land Use and Site Condition ______________________________________ 16 2.2.1 Wind Farm _____________________________________________________________ 16 2.2.2 Overhead Transmission Line _____________________________________________ 42 2.3 Project Description________________________________________________ 51 2.3.1 Wind Farm _____________________________________________________________ 51 2.3.2 Overhead Transmission Line _____________________________________________ 64 2.4 Project Construction Requirements ________________________________ 72 2.4.1 Primary Construction Works _____________________________________________ 72 2.4.2 Temporary Construction Facilities _______________________________________ 73 2.4.3 Utility Requirements ____________________________________________________ 74 2.4.4 Workforce _____________________________________________________________ 74 2.4.5 Worker Accommodation _______________________________________________ 76 2.4.6 Vehicles, Equipment and Heavy Machinery Requirements ________________ 77 2.5 Project Operations & Maintenance Requirements __________________ 78 2.6 Project Milestone _________________________________________________ 79 2.7 Decommissioning of the Project ___________________________________ 80 2.8 Project Alternatives _______________________________________________ 80 2.8.1 No Project Option ______________________________________________________ 81 2.8.2 Alternative Project Site _________________________________________________ 81 2.8.3 Project Technology ____________________________________________________ 83 2.8.4 Wind Farm Project Layout ______________________________________________ 83 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures ii 2.8.5 33/500kV Substation Location ___________________________________________ 87 2.8.6 OHTL Routing __________________________________________________________ 89 3 R EGULATORY F RAMEWORK __________________________________ 99 3.1 National Regulations ______________________________________________ 99 3.1.1 Constitution of Uzbekistan ______________________________________________ 99 3.1.2 Uzbekistan Policy Framework for Wind Projects ___________________________ 99 3.1.3 President Decree № PD-4477 on the Strategy for the Transition of the Republic of Uzbekistan to a Green Economy in the period 2019-2030 ________________________ 99 3.1.4 Law on Nature Protection, 1992 as Amended in 2019 ____________________ 100 3.1.5 Law on Environmental Control, 2013 ____________________________________ 100 3.1.6 Environmental Audit Law No. ZRU-678, 2021 _____________________________ 100 3.1.7 Law on the Rational Use of Energy, 1997 ________________________________ 101 3.1.8 Presidential Decree No. 5863 on Environmental Protection Strategy (30th October 2019) _________________________________________________________________ 101 3.1.9 Environmental Regulator ______________________________________________ 105 3.2 International Conventions/Protocol _______________________________ 105 3.3 Lender Requirements ____________________________________________ 106 3.3.1 EBRD _________________________________________________________________ 107 3.3.2 ADB __________________________________________________________________ 108 3.3.3 Equator Principles _____________________________________________________ 108 3.4 Applicable Environmental Standards _____________________________ 111 3.4.1 Lenders Standards ____________________________________________________ 111 3.5 EIA/ESIA Requirements ___________________________________________ 112 3.5.1 National Requirements ________________________________________________ 112 3.5.2 Lender Requirements __________________________________________________ 113 4 A PPROACH TO ESIA _____________________________________ 115 4.1 ESIA Team _______________________________________________________ 115 4.2 ESIA Methodology _______________________________________________ 116 4.2.1 Baseline Studies and Research _________________________________________ 116 4.2.2 Impact Assessment Significance Criteria ________________________________ 118 4.2.3 Mitigation and Management Measures ________________________________ 123 4.2.4 Residual Impacts ______________________________________________________ 123 4.2.5 E&S Disclosure ________________________________________________________ 124 5 S TANDARDS AND R EGULATORY R EQUIREMENTS __________________ 125 5.1 Terrestrial Ecology _______________________________________________ 125 5.1.1 National Regulations __________________________________________________ 125 5.1.2 Lender Requirements __________________________________________________ 126 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures iii 5.2 Air Quality _______________________________________________________ 129 5.2.1 National Standards ____________________________________________________ 129 5.2.2 Lender Requirements __________________________________________________ 130 5.3 Noise and Vibration ______________________________________________ 132 5.3.1 National Standards ____________________________________________________ 132 5.3.2 Lender Requirements __________________________________________________ 133 5.3.3 Vibration Good Practice Guideline _____________________________________ 135 5.4 Soils, Geology, Groundwater and Surface Water __________________ 135 5.4.1 National Standards ____________________________________________________ 135 5.4.2 Lender Requirements __________________________________________________ 135 5.5 Electric Magnetic Field ___________________________________________ 137 5.5.1 National Requirements ________________________________________________ 137 5.5.2 Lenders Requirements _________________________________________________ 138 5.6 Traffic and Transportation ________________________________________ 139 5.6.1 National Requirements ________________________________________________ 139 5.6.2 Lenders Requirements _________________________________________________ 140 5.7 Archaeology and Cultural Heritage _______________________________ 140 5.7.1 National Requirements ________________________________________________ 140 5.7.2 Lender Requirements __________________________________________________ 141 5.8 Landscape and Visual Amenity___________________________________ 142 5.8.1 National Regulations __________________________________________________ 142 5.8.2 Lender Requirements __________________________________________________ 142 5.9 Shadow Flicker __________________________________________________ 142 5.10 Socio-Economics ________________________________________________ 143 5.10.1 National Regulations __________________________________________________ 143 5.10.2 Lender Requirements __________________________________________________ 144 5.11 Stakeholder Engagement and Consultations ______________________ 145 5.11.1 National Requirements ________________________________________________ 145 5.11.2 Lender Requirements __________________________________________________ 146 5.12 Solid Waste & Wastewater Management _________________________ 148 5.12.1 National Requirements ________________________________________________ 148 5.12.2 Lenders Requirements _________________________________________________ 149 5.13 Resettlement Action Plan ________________________________________ 151 5.13.1 National Regulations __________________________________________________ 151 5.13.2 Lender Requirements __________________________________________________ 151 5.14 Community Health, Safety and Security ___________________________ 153 5.14.1 National Requirements ________________________________________________ 153 5.14.2 Lenders Requirements _________________________________________________ 154 5.15 Labour and Working Conditions __________________________________ 157 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures iv 5.15.1 National Requirements ________________________________________________ 157 5.15.2 Lenders Requirements _________________________________________________ 158 5.16 Human Rights ___________________________________________________ 162 5.16.1 National Context and Regulations _____________________________________ 162 5.16.2 Lender Requirements __________________________________________________ 163 5.17 Climate Affairs ___________________________________________________ 164 5.17.1 National Context and Regulations _____________________________________ 164 5.17.2 Lender Requirements __________________________________________________ 164 6 R EGIONAL B ASELINE C ONDITIONS ____________________________ 166 6.1 Terrestrial Ecology _______________________________________________ 166 6.1.1 General Overview of Biodiversity in Uzbekistan __________________________ 166 6.2 Air Quality _______________________________________________________ 167 6.3 Soils, Geology, Groundwater and Surface Water __________________ 167 6.3.1 Geological Setting & Geomorphological Structure ______________________ 167 6.3.2 Seismicity of the Region _______________________________________________ 168 6.3.3 Hydrology and Hydrographic Network _________________________________ 171 6.3.4 Groundwater _________________________________________________________ 172 6.4 Socio-Economics ________________________________________________ 172 6.4.1 Republic of Uzbekistan ________________________________________________ 172 6.4.2 Bukhara Region _______________________________________________________ 176 6.5 Waste and Wastewater Management ____________________________ 182 6.5.1 Solid Waste ___________________________________________________________ 182 6.5.2 Wastewater __________________________________________________________ 183 6.6 Climate Affairs ___________________________________________________ 184 6.6.1 Overview _____________________________________________________________ 184 6.6.2 National Context _____________________________________________________ 184 6.6.3 Climate Projections ___________________________________________________ 186 6.6.4 Greenhouse Gases Trends by Sector ___________________________________ 186 6.6.5 Key Vulnerabilities _____________________________________________________ 187 P ART A – W IND F ARM __________________________________________ 189 7 T ERRESTRIAL E COLOGY ____________________________________ 189 7.1 Observation and Baseline Conditions _____________________________ 189 7.1.1 Ecosystems, Habitats and Plant Communities ___________________________ 189 7.1.2 Birds __________________________________________________________________ 192 7.1.3 Bats __________________________________________________________________ 205 7.1.4 Mammals (Non-volant) ________________________________________________ 210 7.1.5 Herptiles ______________________________________________________________ 214 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures v 7.1.6 Invertebrates _________________________________________________________ 219 7.2 Receptors _______________________________________________________ 219 7.2.1 Area of Influence _____________________________________________________ 219 7.2.2 Sensitive Receptors ___________________________________________________ 220 7.3 Potential Impacts, Mitigation, Management & Residual Impacts ____ 228 7.3.1 Construction Phase ___________________________________________________ 228 7.3.2 Operation Phase ______________________________________________________ 256 7.3.3 Decommissioning Phase _______________________________________________ 281 7.4 Implementing Mitigation: Planning, Management and Monitoring __ 282 7.4.1 Design _______________________________________________________________ 282 7.4.2 Pre-Construction ______________________________________________________ 282 7.4.3 Construction __________________________________________________________ 283 7.4.4 Post Construction _____________________________________________________ 283 7.4.5 Operation ____________________________________________________________ 283 8 A IR Q UALITY ____________________________________________ 285 8.1 Observation and Baseline Conditions _____________________________ 285 8.1.1 Local Meteorological Conditions _______________________________________ 285 8.1.2 Influences on Air Quality _______________________________________________ 288 8.1.3 Ambient Air Quality Monitoring _________________________________________ 289 8.1.4 Dust Monitoring _______________________________________________________ 293 8.2 Receptors _______________________________________________________ 294 8.3 Potential Impacts, Mitigation, Management & Residual Impact ____ 296 8.3.1 Construction Phase ___________________________________________________ 296 8.3.2 Operational Phase ____________________________________________________ 305 8.3.3 Decommissioning Phase _______________________________________________ 307 8.4 Monitoring ______________________________________________________ 307 9 N OISE AND V IBRATION ____________________________________ 309 9.1 Observation and Baseline Conditions _____________________________ 309 9.1.1 Noise _________________________________________________________________ 309 9.1.2 Vibration _____________________________________________________________ 318 9.2 Receptors _______________________________________________________ 318 9.3 Potential Impacts, Mitigation, Management & Residual Impacts ____ 320 9.3.1 Construction Phase ___________________________________________________ 320 9.3.2 Operational Phase ____________________________________________________ 333 9.3.3 Decommissioning Phase _______________________________________________ 346 9.4 Monitoring ______________________________________________________ 347 10 S OILS , G EOLOGY , G ROUNDWATER & S URFACE W ATER ___________ 348 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures vi 10.1 Observation and Baseline Conditions _____________________________ 348 10.1.1 Project Site Conditions_________________________________________________ 351 10.1.2 Soil Quality Analysis ___________________________________________________ 372 10.2 Receptors _______________________________________________________ 378 10.3 Potential Impacts, Mitigation, Management & Residual Impacts ____ 378 10.3.1 Construction Phase ___________________________________________________ 378 10.3.2 Operational Phase ____________________________________________________ 385 10.3.3 Decommissioning Phase _______________________________________________ 387 10.4 Monitoring ______________________________________________________ 388 11 T RAFFIC AND T RANSPORTATION ______________________________ 389 11.1 Observation and Baseline Environment ___________________________ 389 11.1.1 Project Logistics _______________________________________________________ 389 11.1.2 Project Site Observations ______________________________________________ 394 11.2 Receptors _______________________________________________________ 396 11.3 Potential Impacts, Mitigation, Management & Residual Impact ____ 397 1.1.1 Construction Phase ___________________________________________________ 397 11.3.2 Operational Phase ____________________________________________________ 403 11.3.3 Decommissioning Phase _______________________________________________ 403 11.4 Monitoring ______________________________________________________ 404 12 A RCHAEOLOGY AND C ULTURAL H ERITAGE _____________________ 405 12.1 Observation and Baseline Environment ___________________________ 405 12.1.1 Project Site Archaeological Survey _____________________________________ 410 12.2 Receptors _______________________________________________________ 421 12.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 421 12.3.1 Construction Phase ___________________________________________________ 421 12.3.2 Operational Phase ____________________________________________________ 426 12.3.3 Decommissioning Phase _______________________________________________ 428 12.4 Monitoring ______________________________________________________ 428 13 L ANDSCAPE AND V ISUAL A MENITY ___________________________ 429 13.1 Observation and Baseline Environment ___________________________ 429 13.1.1 Methodology _________________________________________________________ 429 13.1.2 Landscape Character Survey __________________________________________ 432 13.1.3 Visual Quality Survey __________________________________________________ 439 13.1.4 Lighting Survey ________________________________________________________ 450 13.2 Receptors _______________________________________________________ 454 13.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 455 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures vii 13.3.1 Construction Phase ___________________________________________________ 455 13.3.2 Operational Phase ____________________________________________________ 459 14 S HADOW F LICKER ________________________________________ 461 14.1 Observation and Baseline Environment ___________________________ 461 14.2 Receptors _______________________________________________________ 461 14.3 Potential Impacts, Mitigation and Management Measures and Residual Impacts _____________________________________________________ 462 14.4 Monitoring Requirements _________________________________________ 468 15 S OCIO -E CONOMICS _____________________________________ 469 15.1 Observation and Baseline Condition ______________________________ 469 15.1.1 Background & Methodology___________________________________________ 469 15.1.2 Demographic Characteristics __________________________________________ 471 15.1.3 Social Economic Characteristics _______________________________________ 473 15.1.4 Access to Social Services ______________________________________________ 481 15.1.5 Use of the Project Site _________________________________________________ 484 15.1.6 Knowledge About the Project _________________________________________ 490 15.2 Receptors _______________________________________________________ 492 15.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 492 15.3.1 Construction Phase ___________________________________________________ 492 15.3.2 Operational Phase ____________________________________________________ 499 15.4 Monitoring ______________________________________________________ 501 16 S TAKEHOLDER E NGAGEMENT AND C ONSULTATION _______________ 502 16.1 Public Consultation Timeline ______________________________________ 502 16.2 Objectives of the Stakeholder Engagement and Consultation ______ 503 16.3 Stakeholder Engagement and Consultation Process During ESIA Preparation __________________________________________________________ 503 16.4 Summary of Public Consultations and Minutes of Meetings _________ 513 16.4.1 Consultation Meeting at Peshku District Municipality _____________________ 515 16.4.2 Consultation Meeting at Dzhankeldy Village ____________________________ 517 16.4.3 Consultation Meeting at Kalaata Village _______________________________ 520 16.4.4 Consultation Meeting With Local People at Peshku Khokimiyat (Peshku Municipality) ___________________________________________________________________ 521 16.5 Grievance Mechanism __________________________________________ 523 16.6 Grievances Received ____________________________________________ 524 16.7 Media Coverage of the Project __________________________________ 524 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures viii P ART B – O VERHEAD T RANSMISSION L INE ____________________________ 526 17 T ERRESTRIAL E COLOGY ____________________________________ 526 17.1 Observation and Baseline Environment ___________________________ 526 17.1.1 Ecosystems, Habitats and Plant Communities ___________________________ 526 17.1.2 Terrestrial Mammals ___________________________________________________ 528 17.1.3 Bat Roosts ____________________________________________________________ 530 17.1.4 Reptiles ______________________________________________________________ 531 17.1.5 Invertebrates _________________________________________________________ 534 17.1.6 Birds __________________________________________________________________ 535 17.2 Receptors _______________________________________________________ 540 17.2.1 Area of Influence _____________________________________________________ 540 17.2.2 Sensitive Receptors ___________________________________________________ 541 17.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 548 17.3.1 Construction Phase ___________________________________________________ 548 17.3.2 Operation Phase ______________________________________________________ 569 17.3.3 Decommissioning _____________________________________________________ 574 17.4 Implementing Mitigation: Planning, Management and Monitoring __ 574 17.4.1 Design _______________________________________________________________ 574 17.4.2 Pre-construction ______________________________________________________ 574 17.4.3 Construction __________________________________________________________ 575 17.4.4 Post-Construction _____________________________________________________ 575 17.4.5 Operation ____________________________________________________________ 576 18 A IR Q UALITY ____________________________________________ 577 18.1 Observation and Baseline Environment ___________________________ 577 18.1.1 Ambient Air Quality Monitoring _________________________________________ 577 18.2 Receptors _______________________________________________________ 577 18.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 579 18.3.1 Construction Phase ___________________________________________________ 579 18.3.2 Operational Phase ____________________________________________________ 583 18.3.3 Decommissioning Phase _______________________________________________ 585 18.4 Monitoring ______________________________________________________ 585 19 N OISE AND V IBRATION ____________________________________ 586 19.1 Observation and Baseline Environment ___________________________ 586 19.1.1 Noise _________________________________________________________________ 586 19.1.2 Vibration _____________________________________________________________ 586 19.2 Receptors _______________________________________________________ 586 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures ix 19.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 588 19.3.1 Construction Phase ___________________________________________________ 588 19.3.2 Operational Phase ____________________________________________________ 597 19.3.3 Decommissioning Phase _______________________________________________ 598 20 S OILS , G EOLOGY AND G ROUNDWATER _______________________ 599 20.1 Observation and Baseline Environment ___________________________ 599 20.1.1 OHTL Alignment Conditions ____________________________________________ 599 20.1.2 Soil Quality Analysis ___________________________________________________ 599 20.2 Receptors _______________________________________________________ 602 20.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 602 20.3.1 Construction Phase ___________________________________________________ 602 20.3.2 Operational Phase ____________________________________________________ 607 20.3.3 Decommissioning Phase _______________________________________________ 608 20.4 Monitoring ______________________________________________________ 609 21 E LECTRIC M AGNETIC F IELD _________________________________ 610 21.1 Introduction _____________________________________________________ 610 21.1.1 Effects on Human Health ______________________________________________ 610 21.2 Baseline Conditions ______________________________________________ 610 21.3 Receptors _______________________________________________________ 611 21.4 Potential Impacts, Mitigation, Management and Residual Impacts _ 611 21.4.1 Construction Phase ___________________________________________________ 611 21.4.2 Operational Phase ____________________________________________________ 611 21.4.3 Decommissioning Phase _______________________________________________ 614 22 T RAFFIC AND T RANSPORTATION ______________________________ 615 22.1 Observation and Baseline Environment ___________________________ 615 22.2 Receptors _______________________________________________________ 615 22.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 616 22.3.1 Construction Phase ___________________________________________________ 616 22.3.2 Operational Phase ____________________________________________________ 621 22.3.3 Decommissioning Phase _______________________________________________ 621 22.4 Monitoring ______________________________________________________ 621 23 I NFRASTRUCTURE AND U TILITIES ______________________________ 623 23.1 Observation and Baseline Environment ___________________________ 623 23.2 Potential Impact _________________________________________________ 625 23.3 Mitigation and Management Measures ___________________________ 625 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures x 23.3.1 Transmission Line Crossings _____________________________________________ 626 23.3.2 Railway Crossing ______________________________________________________ 626 23.3.3 Highway Crossing _____________________________________________________ 626 23.3.4 Small Road Crossing ___________________________________________________ 626 24 A RCHAEOLOGY AND C ULTURAL H ERITAGE _____________________ 627 24.1 Observation and Baseline Environment ___________________________ 627 24.1.1 Archaeological Survey Along OHTL Route ______________________________ 628 24.2 Receptors _______________________________________________________ 628 24.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 628 24.3.1 Construction Phase ___________________________________________________ 628 24.3.2 Operational Phase ____________________________________________________ 629 24.3.3 Decommissioning Phase _______________________________________________ 629 24.4 Monitoring ______________________________________________________ 631 25 L ANDSCAPE AND V ISUAL A MENITY ___________________________ 632 25.1 Observation and Baseline Environment ___________________________ 632 25.1.1 Landscape Baseline ___________________________________________________ 632 25.1.2 Visual Quality _________________________________________________________ 640 25.2 Receptors _______________________________________________________ 646 25.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 647 25.3.1 Construction Phase ___________________________________________________ 647 25.3.2 Operational Phase ____________________________________________________ 651 26 S OCIO -E CONOMICS _____________________________________ 653 26.1 Observation and Baseline Condition ______________________________ 653 26.1.2 Socio Economic Survey ________________________________________________ 655 26.2 Receptors _______________________________________________________ 655 26.3 Potential Impacts, Mitigation, Management and Residual Impacts _ 655 26.3.1 Construction Phase ___________________________________________________ 655 26.3.2 Operational Phase ____________________________________________________ 656 26.4 Monitoring ______________________________________________________ 656 27 S TAKEHOLDER E NGAGEMENT AND C ONSULTATION _______________ 657 27.1 Public Consultation Timeline ______________________________________ 657 27.2 Stakeholder Engagement and Consultation Process During ESIA Preparation __________________________________________________________ 658 27.3 Summary of Public Consultations and Minutes of Meetings _________ 667 27.3.1 Consultation Meeting at Konimekh District Municipality __________________ 669 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures xi 27.3.2 Consultation Meeting at Gijduvon District Municipality ___________________ 670 P ART C - A PPLICABLE TO B OTH W IND F ARM & OHTL __________________ 672 28 S OLID W ASTE & W ASTEWATER M ANAGEMENT __________________ 672 28.1 Observation and Baseline Environment ___________________________ 672 28.1.1 Waste Management at the Project Area _______________________________ 672 28.2 Potential Impacts ________________________________________________ 674 28.2.1 Construction Phase ___________________________________________________ 674 28.2.2 Operational Phase ____________________________________________________ 677 28.2.3 Decommissioning Phase _______________________________________________ 679 28.3 Mitigation and Management Measures ___________________________ 679 28.3.1 Waste Characterization _______________________________________________ 679 28.3.2 Waste Management Hierarchy ________________________________________ 680 28.3.3 Construction Phase ___________________________________________________ 681 28.3.4 Operation Phase ______________________________________________________ 683 28.3.5 Decommissioning Phase _______________________________________________ 684 28.4 Monitoring ______________________________________________________ 685 29 R ESETTLEMENT A CTION P LAN _______________________________ 686 29.1 Wind Farm ______________________________________________________ 686 29.1.1 Background and Context _____________________________________________ 686 29.1.2 Land Users on the Project Site __________________________________________ 688 29.2 Overhead Transmission Line ______________________________________ 693 29.2.1 Background & Context ________________________________________________ 693 29.3 Grievances Received ____________________________________________ 694 30 C OMMUNITY , H EALTH , S AFETY & S ECURITY _____________________ 695 30.1 Observation and Baseline Condition ______________________________ 695 30.1.1 Wind Farm ____________________________________________________________ 695 30.1.2 OHTL _________________________________________________________________ 695 30.1.3 Health Protection Zone ________________________________________________ 696 30.1.4 Existing Public Facilities/Infrastructure ___________________________________ 697 30.2 Potential Impacts, Mitigation, Management and Residual Impacts _ 698 30.2.1 Construction Phase ___________________________________________________ 698 30.2.2 Operational Phase ____________________________________________________ 701 30.2.3 Decommissioning Phase _______________________________________________ 704 30.3 Mitigation and Management Measures ___________________________ 704 30.4 Monitoring ______________________________________________________ 710 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures xii 31 L ABOUR & W ORKING C ONDITIONS __________________________ 712 31.1 Observations and Baseline Conditions ____________________________ 712 31.2 Potential Impacts, Mitigation, Management & Residual Impact ____ 713 31.2.1 Construction Phase ___________________________________________________ 713 31.2.2 Operational Phase ____________________________________________________ 715 31.3 Mitigation and Management Measures ___________________________ 716 31.4 Monitoring ______________________________________________________ 724 32 I NFLUX I MPACT A SSESSMENT ________________________________ 726 32.1 Potential Impacts, Mitigation, Management & Residual Impact ____ 726 32.1.1 Increased Pressure on Public Infrastructure & Services ___________________ 726 32.1.2 Local Economy _______________________________________________________ 726 32.1.3 Impact to Local Customs ______________________________________________ 727 32.2 Mitigation and Management Measures ___________________________ 728 32.3 Monitoring ______________________________________________________ 729 33 H UMAN R IGHTS I MPACT A SSESSMENT _________________________ 731 33.1 Overview _______________________________________________________ 731 33.2 Potential Impacts upon Human Rights ____________________________ 731 33.2.1 Construction __________________________________________________________ 731 33.2.2 Operational Phase ____________________________________________________ 734 33.3 Monitoring ______________________________________________________ 734 34 C LIMATE A FFAIRS ________________________________________ 735 34.1 Potential Project Impacts upon Climate Change __________________ 735 34.1.1 Construction Phase ___________________________________________________ 735 34.1.2 Operational Phase ____________________________________________________ 737 34.2 Vulnerability of the Project to Climate Change ____________________ 737 34.2.1 Climate Physical Risks _________________________________________________ 737 34.2.2 Climate Transition Risks ________________________________________________ 738 35 C UMULATIVE I MPACTS ____________________________________ 740 35.1 Identification of Valued Environmental and Social Components (VECs) 740 35.2 Identification of Other Activities and Environmental Drivers _________ 741 35.3 Assessment of Cumulative Impacts on VECs _______________________ 744 36 R EFERENCES ____________________________________________ 754 Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures xiii Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures xiv L IST OF A BBREVIATIONS Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling