Dzhankeldy Wind Power Project


Download 6.64 Mb.
Pdf ko'rish
bet4/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   2   3   4   5   6   7   8   9   ...   203
Bog'liq
56086-001-esia-en

A
BBREVIATION
 
M
EANING
 
PD 
Presidential Decree 
PBF 
Priority Biodiversity Features 
PEF 
Purchase Electrical Facilities 
PPA 
Power Purchase Agreement 
PR 
Performance Requirement 
RAF 
Resettlement Action Framework 
RAP 
Resettlement Action Plan 
SCEEP 
State Committee on Ecology and Environmental Protection 
SDOD 
Shut Down On Demand 
SEA 
Sexual Exploitation & Abuse 
SNH 
Scottish Natural Heritage 
SO
2
Sulphur Dioxide
t
CO
2

Tonnes of carbon dioxide equivalent 
UN 
United Nations 
UNESCO 
United Nations Educational, Scientific and Cultural Organization 
VP 
Vantage Point 
WHO 
World Health Organisation 
5 Capitals 
5 Capitals Environmental and Management Consultancy 
JE 
Juru Energy 
 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 

1 I
NTRODUCTION 
The government of the Republic of Uzbekistan through the Ministry of Energy aims to increase 
the electricity production in the country from 12.9GW in 2019 to 29.3GW in 2030 in order to 
foster economic growth as part of the Uzbekistan 2030 Energy Strategy.
The Uzbekistan 2030 Energy Strategy defines the mid-term and long-term objectives and 
directions for the development in the power sector for ensuring electricity supply in Uzbekistan 
between 2020-2030. One of the objectives of the Energy Strategy include the development 
and expansion of renewables use and their integration into the unified power system. In order 
to fulfil this objective, the government of Uzbekistan intends to: 
 
Ensure diversification in power and heat energy sectors through increased share of 
renewable energy sources and creation of renewable energy investment project 
mechanism utilising PPP approaches, enhancement of government policies 
related to development of renewable energy sources, demonstration of 
renewable projects. 
In regard to the development of wind farms the Energy Strategy states the following as priority: 
“Creation of large-scale wind farms with single site capacities ranging from 100MW to 500MW 
mostly concentrated in North-Western region (Republic of Karakalpakstan and Navoi region) 
shall be the main priority of wind power development” 
The Dzhankeldy 500MW Wind Farm aligns with the above statement and the 2030 Energy 
Strategy. 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling