Engineering economy lorie m. Cabanayan francisco d. Cuaresma


Modified B/C ratio with PW


Download 436.52 Kb.
Pdf ko'rish
bet41/57
Sana21.11.2023
Hajmi436.52 Kb.
#1790506
1   ...   37   38   39   40   41   42   43   44   ...   57
Bog'liq
COMPILED LECTURE IN ENGINEERING ECONOMY

Modified B/C ratio with PW 
 
 
B/C = PW (B) 
– PW (O&M) 

Conventional B/C ratio with AW 
 
 
B/C = AW (benefits of the proposed project) 

AW (B)
AW (total costs of the proposed project)
CR + AW (O &M) 
Θ’ = 5 years because the 
cumulative discounted balance 
turns positive at EOY 5. 


51 
Where: AW = annual worth 
B = benefits of the proposed project 
CR = capital recovery amount (i.e., the equivalent annual cost of the initial 
investment, I, including an allowance for salvage value, if any.) 
O&M = operating and maintenance costs of the proposed project 
 
Modified B/C ratio with AW 
 
 
B/C = AW (B) 
– AW (O&M) 
 
 
 
CR 
 
Conventional B/C ratio with PW, Salvage value (S) included 
 
 
B/C = PW (benefits of the proposed project) 

PW (B) 
PW (total costs of the proposed project)

– PW (S) + PW (O &M) 
 
Modified B/C ratio with PW, Salvage value (S) included 
 
 
B/C = PW (B) 
– PW (O&M) 
 
 

– PW (S) 
 
Sample Problem 1. The city of Bugtussle is considering extending the runways of its Municipal 
Airport so that commercial jets can use the facility. The land necessary for the runway extension is 
currently farmland, which can be purchased for $350,000. Construction costs for the runway 
extension are projected to be $600,000, and the additional annual maintenance costs for the 
extension are estimated to be $22,500. If the runways are extended, a small terminal will be 
constructed at a cost of $250,000. The annual operating and maintenance costs for the terminal are 
estimated at $75,000. Finally, the projected increase in flights will require the addition of 2 air 
traffic controllers, at an annual costs of $100,000. Annual benefits of the runway extension have 
been estimated as follows: 
$325,000 
rental receipts from airlines leasing space at the facility 
$ 65,000 
airport tax charged to passengers 
$ 50,000 
convenience benefit for residents of Bugtussle 
$ 50,000 
additional tourism dollars of Bugtussle 
Apply the B/C ratio method with a study period of 20 years and a nominal interest rate of 10% per 
year to determine whether the runways at Bugtussle Municipal Airport should be extended. 
Solution: 

Download 436.52 Kb.

Do'stlaringiz bilan baham:
1   ...   37   38   39   40   41   42   43   44   ...   57




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling