Business continuity
209
FIgURE
18.1
Disaster recovery timeline and costs
A
B
C
D
Cost of operation
Major
incident at
point of
time A
A
B
C
D
Major
incident, such as a fire or long-term power cut
Level of
service
Time
Full recovery
from this point
Increased cost
of
operation
Limited emergency operations commenced at a back-
up site, as planned by the disaster recovery plan
Start-up of operations at an alternative emergency site,
but the back-up site
operations are disrupted
Full recovery from this point
Reduced level
of service
Cost of operation
Level of service
Figure 18.2 provides a model for BCP that is consistent with ISO 22301. Table 18.1
provides a checklist of the key activities involved in BCP. Having business continuity
plans is recognized as essential by most large organizations. Indeed, many governments
take an active role in encouraging businesses (especially small businesses) to develop
and implement adequate business continuity plans.
The main change introduced by ISO 22301 in comparison to BS 25999 is that
ISO 22301 is the first standard to be written using
the new high-level structure, which
is common to all new management systems standards. This will make integration