Involuntary Resettlement Assessment and Measures
Download 0.54 Mb. Pdf ko'rish
|
- Bu sahifa navigatsiya:
- SUBTOTAL : ROAD SECTION 3 - SHAKHRINAV DISTRICT 874,191.60 ROAD SECTION 4: SHAKHRINAV DISTRICT
- (m2; m3) Cost per unit (Somoni) Total cost (Somoni)
- Owner’s Name Ref Type of Structure Type of Construction Material Structure Area
- SUBTOTAL : ROAD SECTION 4 - SHAKHRINAV DISTRICT 611,793.25 ROAD SECTION 4: TURSUNZADE DISTRICT
- Structure Area (m2; m3) Cost per unit (Somoni) Total cost (Somoni)
- SUBTOTAL : ROAD SECTION 4 - TURSUNZADE
- APPENDIX 7: PUBLIC ADVERTISEMENTS OF ASSET SURVEY CUTOFF DATE. The following public advertisements were issued
- Newspaper: "
Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Jalilov Tura 44 Shop Brick, concrete 18.5x18 = 333m2 390.00 129,870.00 Abdulloeva Gulsara 45 Small eatery Brick, metal, ceramic tale 3x17 = 51m2 347.00 17,697.00 Sharipov Rahmon 46 Eatery-shed Metal 6.4x4.5 = 28.8m2 347.00 9,993.60 Wall Bricks 5.4x14 = 75.6m2 347.00 26,233.20 Butcher’s shop Concrete 3.4x14 = 47.6m2 347.00 16,517.20 Sheds C/blocks, Metal 17x7=119m2 129.00 15,351.00 Boronov Ismatullo 47 Wall RFC 105x0.12x2.5=31.5m3 115.00 3,622.50 Shed (Road maintenance unit) C/blocks 50x8.0=400m2 129.00 51,600.00 48 Fence Wire net 15x1.5=22.5m2 10.00 225.00 Abdulloeva Misqol Barn Clay/Concrete 3x3 = 9m2 198.00 1,782.00 Boboev Bahrullo 49 Butcher’s shop C/blocks 7x4 = 28m2 347.00 9,716.00 Mirzoev Hasan 50 Fence Wire net 19x1.5 = 28.5m2 10.00 285.00 Donchik Aleksandr 51 Fence Wire net 28x2 = 56m2 10.00 560.00 52 Wall Clay/concrete 23x0.3x3.0=20.7m3 385.00 7,969.50 Boboshoev Ahmad Barn Clay/concrete 2.5x4 = 10m2 198.00 1,980.00 53 House Concrete 9x4.0 = 36m2 347.00 12,492.00 Qaramirzoeva Orzu Wall C/blocks 4x0.25x3=3m3 385.00 1,155.00 54 Wall C/blocks 13x0.3x2.5=9.8m3 76.00 744.80 Khojamov Murodali Shop Clay/brick 6x9 = 54m2 390.00 21,060.00 Shed Timber/Metal 6x2.5=15m2 129.00 1,935.00 SUBTOTAL : ROAD SECTION 3 - SHAKHRINAV DISTRICT 874,191.60 ROAD SECTION 4: SHAKHRINAV DISTRICT Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m2; m3) Cost per unit (Somoni) Total cost (Somoni) Qurbonova Gulbahor 55 Carriage Metal/brick 3x5 = 15m2 380.00 5,700.00 House Clay 6.5x13 = 84m2 347.00 29,148.00 Wall Concrete 22x0.5x2=22m3 320.00 7,040.00 Barn Clay/ 6x3.3 = 19.8m2 198.00 3,920.40 Qurbonov Ashur 56 Concrete 22x0.3x2=13.2m3 385.00 5,082.00 Eshonov 57 Wall Concrete 14x0.3x3.5=14.7m3 385.00 5,659.50 145 Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Cattle shed Clay/concrete 3.5x7.2 = 25.2m2 198.00 4,989.60 Hamroh Workshop C/blocks/Concrete 6x3.5 = 21m2 198.00 4,158.00 House Clay/c/block 4x6.3 = 25.2m2 620.00 15,624.00 Barber’s shop C/block 6x4 = 24m2 347.00 8,328.00 Shop C/block 7x4 = 28m2 390.00 10,920.00 Shed Metal 14x2.5 = 35m2 390.00 27,300.00 Barn Concrete/ 10x2.6 = 26m2 198.00 5,148.00 Aminov Ilhom 58 Workshop C/block 4x5 = 20m2 331.00 6,620.00 Wall Clay/concrete 2.0x0.50x2.5=2.5m3 76.00 190.00 Shop Concrete/ Cement 10x6 = 60m2 644.00 38,640.00 Barn Clay/concrete 10x4 = 40m2 198.00 7,920.00 Roziev Maruf 59 Basement Concrete 3x5 = 15m2 198.00 2,970.00 Wall Clay/concrete 14x0.4x3.5=19.6m3 76.00 1,489.60 Shed Timber 4.3x8=34.4m2 129.00 4,437.60 Ashurov Boboqul 60 Barn Clay/Concrete 3.5x12 = 42m2 198.00 8,316.00 Shed Metal 4.8x6=28.8m2 129.00 3,715.20 Eatery Timber 4.7x10 = 47m2 198.00 9,306.00 Cattle shed Clay/brick/concrete 6.7x3.4 = 22.8m2 198.00 4,514.40 Barn Clay/brick/concrete 6.6x3.2 = 21.1m2 198.00 4,177.80 Kholova Melikoy 61 Workshop Clay/brick/concrete 10x9.3 = 93m2 331.00 30,783.00 Roziev Ahliddin 62 Wall Clay/Concrete 16.5x0.4x2.8=18.5m3 76.00 1,406.00 Aminov Vali 63 Border Concrete 14x0.2x0.15=0.42m3 360.00 151.20 Wall Concrete 10x0.4x2.5=10m3 76.00 760.00 Shed Brick/concrete 5.5x3.5 = 19.3m2 129.00 2,489.70 Shop Timber 5.5x3 = 16.5m2 390.00 6,435.00 Shed Metal 8.5x2.2=18.7m2 129.00 2,412.30 Cattle shed Concrete 9.5x9.0 = 85.5m2 198.00 16,929.00 Davlatov Yunus 64 House Clay/Concrete 8.2x9.1 = 74.62m2 347.00 25,893.14 House Clay/brick/concrete 10.5x14.8 = 155.4m2 620.00 96,348.00 Wall Concrete 15.6x2.5x 0.1 =3.9 m3 115.00 448.50 Rahimov Aminjon 65 Fence Metal 6x1=6m2 10.00 60.00 146 Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Retaining wall Concrete 25x0.5x1.5=18.8m3 320.00 6,016.00 Shed Metal 11x4=44m2 129.00 5,676.00 Retaining wall Concrete 16x0.5x1.2 = 9.6m3 320.00 3,072.00 Shed Timber/metal 5.5x3 = 16.5m2 129.00 2,128.50 Cattle shed Clay/brick/ 16.5x4 = 66m2 198.00 13,068.00 Shohimardonov Olimjon 66 Retaining wall Concrete 30x0.5x1.5=22.5m3 320.00 7,200.00 Retaining wall Concrete 9x0.5x0.7 = 3.2m3 320.00 1,024.00 Cattle shed Clay/concrete 3x12 =36m2 198.00 7,128.00 Muzaffarov Umar 67 Shed Metal 5x8 = 40m2 129.00 5,160.00 Retaining wall Concrete 5x0.5x0.8=2m3 320.00 640.00 Shed Metal 5x3=15m2 129.00 1,935.00 Cattle shed Clay/concrete 5.7x8 = 45.6m2 198.00 9,028.80 Rashidov Abduhalim 68 Pool Concrete 3.5x13 =45.5m2 198.00 9.01 Wall Concrete 48x0.4x2.2=42.2m3 320.00 13,504.00 Retaining wall Concrete 28x0.5x2=28m3 320.00 8,960.00 Fence Metal 20x1=20m2 10.00 200.00 Negmartov Alijon 69 Shed Metal 5x10=50m2 129.00 6,450.00 Fence Wire net 17x2=34m2 10.00 340.00 Retaining wall Concrete 20x0.5x2=20m3 320.00 6,400.00 Barn Clay/concrete 4x10 = 40m2 198.00 7,920.00 Yorov Said 70 Cattle shed Clay 2.5x3 = 7.5m2 198.00 1,485.00 Retaining wall Concrete 18x0.5x1.8=16.2m3 320.00 5,184.00 Yorova Shamigul 71 Barn Clay/Concrete 3.5x10 = 35m2 198.00 6,930.00 House Clay/concrete 4x26 = 104m2 347.00 36,088.00 Odinaev Murodali 72 Retaining wall Concrete 15x0.5x1.5=11.3m3 320.00 3,616.00 Retaining wall Concrete 7x0.5x1.5=5.3m3 320.00 1,696.00 Odinaev Tojiddin 73 Barn Clay/Concrete 5x17 = 85m2 198.00 16,830.00 Ustoeva Shahlo 74 Wall C/blocks 25x0.25x3=18.8m3 385.00 7,315.00 Gaafurov Saidhosha 75 House Clay/concrete 7x4 = 28m2 620.00 17,360.00 SUBTOTAL : ROAD SECTION 4 - SHAKHRINAV DISTRICT 611,793.25 ROAD SECTION 4: TURSUNZADE DISTRICT Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m2; m3) Cost per unit (Somoni) Total cost (Somoni) Kholov Isroil 1 slaughter area Cement blocks, concrete 9.4x6.50x3.5 = 214 m 3 26 5,600.00 Tojikmatlubot, 2 border Concrete 30x0.3x0.8 = 9 m 3 56 500.00 147 Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Tursunzade District fence metal 30x0.3 = 9 m 2 56 500.00 3 Border Concrete, 61x0.3x0.3 = 6 m 3 83 500.00 Huseynov Bakhtiyor fence Metal 61x0.8 = 48.80 m2 20 1,000.00 4 Wall Clay, concrete 18x0.5x2.8 = 25 m 2 72 1,800.00 Mirsharipov Mullo 5 Wall, Clay, concrete, 15.6x0.5x2.8 = 22 m 3 55 1,200.00 fence, Metal, 30x1 = 30 m 2 31 920.00 Shed (vineyard) Metal, 3x2x3 = 18 m 3 56 1,000.00 Barn, Clay, concrete 38x4x2.5 = 380 m3 12 4,500.00 Boboev Boborajab Cattle barn Clay, concrete 7x13x4 = 364 m3 15 5,400.00 6 Fence, Metal, wire net 43x2.5 = 105.50m2 11 1,200.00 Sambusa bakery Cement blocks 7x4x3 = 84m 3 43 3,600.00 Clay oven Clay, brick 2x2x2 = 8m 3 63 500.00 Shed Metal 4x5x3.5 = 70 m 3 7 500.00 reservoir (2 items) Metal 12x3x3.5 =126m 3 1 100.00 Bobosaidov Haitmurod Pipe D-20 mm Metal 30 x 0.20 = 6m 2 33 200.00 7 Wall Cement blocks Clay blocks 27x0.25x2.70 = 18m 3 139 2,500.00 Zabirov Tohir Cattle barn 5 x 10 x 2.5 = 125m 3 36 4,500.00 8 Wall Armored concrete 30x0.12x2.2 = 13.20m 3 212 2,800.00 Muhibulloev Ahmad Barn Clay, concrete 5.50x3x2.5 = 41 m 3 56 2,300.00 9 Wall Cement, concrete 46x0.3x2.7 = 37m 3 130 4,800.00 Jumaev Mavjud Cattle barn Concrete 9x5x2.70 = 121 m3 42 5,100.00 10 Border Concrete 41x0.15x0.25 = 10m 3 60 600.00 Wall Cement blocks 12x0.4x3 = 14m 3 157 2,200.00 Fence Metal 41x1.20 = 49.2m2 45 2,200.00 Jalilov Nematullo Shed Metal 3x4x 2.50 = 30m3 20 600.00 11 Wall Clay, concrete 7x0.4x2.20 = 6m 3 83 500.00 Concrete – Concrete, metal sheet 7x0.4x0.6 = 2m 3 100 200.00 fence Clay, concrete 7x0.20x2.5 = 3m 3 67 200.00 Ilyasova Zikamo 6.5 x 4 x 3 = 78m 3 33 2,600.00 Ilyasov Nazriddin 12 Wall Concrete, metal sheet 19 x 0.5 x 3 = 28m 3 89 2,500.00 148 Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Ilyasova Khayriniso 13 Wall Concrete, clay 20 x 0.5 x 3 = 30m 3 80 2,400.00 14 Room Clay, concrete 10x4.5x3.5 = 157m 3 61 9,500.00 Cattle barn Clay, concrete 12.5x6x3 = 225m 3 38 8,600.00 Pool Concrete 3x2x1.7 = 10m 3 50 500.00 Kamolova Khosiyat Barn Clay, concrete 14.5x8x2.5 = 290m 3 27 7,800.00 15 Wall Clay, concrete 7.70x0.5x3 = 12m 3 46 550.00 Kandov Sadridin Cattle barn Clay, concrete 10x5.60x4.5 = 252m 3 27 6,800.00 Zaydulloeva Lutfia 16 Wall Clay, concrete 24x0.5x3 = 36 m3 81 2,900.00 17 Wall Clay, concrete 5x0.5x2.80 = 7m3 80 560.00 Fence Armored concrete 60x2 = 120m 2 13 1,500.00 Shed (vineyard) Metal 12x3x3 = 108m3 5 500.00 Barn Clay, concrete 4x15x3 = 180m3 27 4,800.00 Karimova Abruniso Wall reinforced concrete 42x0.25x1.70 = 18m 3 228 4,100.00 18 Wall Clay, concrete 17x0.5x2 = 17m3 82 1,400.00 Kamolov Zayniddin Shed (vineyard) Clay, concrete 6x6x2.5 = 90m3 10 900.00 19 Fence Wire net 25x2 = 50m 2 10 500.00 Ismatov Huseyn Shed (vineyard) Metal 10x4x2.5 = 100m 3 35 3,500.00 20 Wall Clay, concrete 7x0.5x3 = 10m 3 80 800.00 Ashurov Zarobsho Shed (barn) Clay, concrete, metal 8x3x3 = 72m 3 7 500.00 Nurov Muhtado 21 Wall Cement block, concrete 68x0.25x2.20 = 37m 3 122 4,500.00 Kodirov Kumri 22 Fence Wire net 56x2 = 112 m 2 9 1,000.00 Sherov Abdufatoh 23 Border (gas station) Concrete 88x0.25x0.40 = 9m 3 56 500.00 Nazirov Sherali 24 Border (gas station) Concrete 56x0.15x 0.25 = 2m 3 300 600.00 Mahmudov Tolib 25 Fence (gas station) Wire net 40x1 = 40 m 2 15 600.00 26 Eatery border Concrete 32x0.25x 0.30 = 2m 3 200 400.00 Obidov Toshmurod Fence Metal 32x0.75 = 24m 2 33 800.00 Sanginov Rajabali 27 “Dusti” farm office Concrete 72x0.5x2 = 72m 3 25 1,800.00 149 Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Wall 41x0.2x0.8 = 70m 3 26 1,800.00 Rajabov Avazmurod 28 Fence Wire net 62x1 = 62m 2 10 600.00 Safoev Ahliddin 29 Fence Wire net 40x1.5 = 60m 2 10 600.00 30 Wall Concrete 6x0.5x2.5 = 7m 3 214 1,500.00 Shed Metal 4x4x4 =64 m 3 19 1,200.00 Cattle barn Clay, concrete 16x6x4 = 384m 3 20 7,500.00 Barn Clay, concrete 3x3x2.5 = 22m 3 45 1,000.00 Jalolov Umarali Shed Wood 3x2x2 = 12 m 3 42 500.00 31 Wall Armored concrete 10x0.1x0.2 = 0.20m 3 2500 500.00 Anorov Said Barn Cement blocks, concrete 22x6x3 = 396m 3 22 8,700.00 Boborajabova Khoharkhon 32 Wall Cement blocks 20x0.3x2.10 = 13m 3 138 1,800.00 33 Wall Armored concrete 20x0.12x2 = 5m 3 240 1,200.00 Shed Armored concrete, metal 12x5x2 = 120m 3 13 1,500.00 Jalolova Adolat Barn Brick, concrete 7x4x2.80 = 78m 3 49 3,800.00 Hafizov Abduvohid 34 Wall Cement blocks 30x0.25x2 = 15m3 120 1,800.00 35 Shed (vineyard) Metal 20x3.70x3.5 = 259m 3 6 1,500.00 Tokhtaeva Yorkinoy Fence Cement blocks 5.3x2.2x2.2 = 26m 3 104 2,700.00 36 Wall Clay, concrete 22x0.4x2.7 = 24m 3 71 1,700.00 Shed Clay, concrete 3.70x3.2x2.7 = 32m 3 20 650.00 Nurov Tolibjon Cattle Barn Clay, concrete 12.8x3.2x2.8 =115m 3 40 4,600.00 37 Fence Metal 14x1.2 = 16.80m2 30 500.00 Saidjafarova Najofmoh Wall Concrete 14x0.3x0.7 = 3m 3 167 500.00 38 Fence Wire net 55x0.5x2 = 55m3 11 600.00 Shed (vineyard) Metal 53x1.7 = 90.10m2 13 1,200.00 Khidirov Akbarali Bridge Concrete slab 25x4x4 = 400m3 2 600.00 39 Wall Clay 55x0.5x2 = 55m3 75 4,100.00 Fence Wire 53x1.7 = 90.10m2 9 800.00 Shed (vineyard) Concrete, metal 25x4x4 = 400m3 4 1,700.00 Boboev Safar Bridge Concrete 3x2.5x1 = 8m 3 75 600.00 Jobirov Jomi (State Property Committee) 40 Security office Metal, concrete 27.20x11x6.8 = 2035m 3 150 Owner’s Name Ref Type of Structure Type of Construction Material Structure Area (m 2 ; m 3 ) Cost per unit (Somoni) Total cost (Somoni) Tile of 2006 41 Security office Concrete, metal 25x8.60x7 =1505m 3 Security office Metal 71x1x3 = 213m 3 Well Concrete, metal 14x1x1.3 = 18 m 3 Abdulloev Idiboy (Custom) Wall 245x0.3x1.5 = 110m 3 42 Metal border Concrete 110x0.20x 0.25 =6m 3 158 950.00 well foundation Concrete 6x8x0.50 = 24m 3 54 1,300.00 Komilov Mirzomidin Fence Concrete, Metal 60x0.70 = 42.60m 2 20 860.00 43 Wall Cement blocks 17x0.5x3 = 25m 3 136 3,400.00 Nazarov Hotam Cement blocks 7x5x3 = 105m 3 33 3,500.00 Karomat 44 RC fence Armature 18 x 2 = 36m 3 42 1,500.00 SUBTOTAL : ROAD SECTION 4 - TURSUNZADE 198,190.00 151 APPENDIX 7: PUBLIC ADVERTISEMENTS OF ASSET SURVEY CUTOFF DATE. The following public advertisements were issued: Newspaper: "Hakikati Shakhrinav" Date: 28 November 2009 Place of issue: Shakhrinav district English Translation of Text: The Derivative Enterprise of Technical Registration of the Shakhrinav district is kindly informing the citizens, head of enterprises and farmers which is the vicinity of Dushanbe-Tursunzoda road: the construction of any kind of buildings or tree plantation is not allowed, dated 11 of November 2009. The Government of the Republic of Tajikistan will not invest, if the buildings were constructed or trees were planted after 11 of November 2009. Newspaper: "Nasimi Ayom" Date: 12 December 2009 Place of issue: Rudaki district English Translation of Text: According to the instruction of the Prime-Minister of the Republic of Tajikistan of 20 June 2009, under #52 425 (15-2), to remove the constructed buildings and houses in near by road of Dushanbe -Tursunzoda and necessity of moving the household buildings to other places while reconstruction starts in this road. For solving these problems, the working group was organized by the chairman of the district under order # 117, dated 28 October 2009. Mr. S. Boboazimov is appointed as the Head of the working group. The working group for removing the buildings and constructed houses in the road of Dushanbe-Tursunzoda is giving assignments to the government structures. According to the project the width of the road comes to 23 meters and it will be 4 lane roads. General Advertisement Issued by PIU: For the attention of the inhabitants of Rudaki, Gissar, Shahrinaw Distr icts and Tursunzade town, which are located in the roadside of Dushanbe-Tursunzade-border Uzbekistan, this is to inform you that in connection with the rehabilitation of this road, the special committee has identified the 152 damage for household during the realization of Project up to November 28, 2009. Therefore, after November 28, 2009, the construction of all type of structures, tree planting and other is proh ibited in the roadside and in case of unauthorized actions, the damage will not be charged by road construction. Ministry of Transport and Communications Project Implementation Unit Download 0.54 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling