Announcement Letter (Planning Memo)

The client is informed of the audit through an announcement or engagement letter from the Internal Audit Director. This letter communicates the scope and objectives of the audit, the auditors assigned to the project and other relevant information.



  • Opening Conference

    Internal Audit discusses the IA process and the plan for completing the audit. During this meeting, the client describes the unit or system to be reviewed, the organization, available resources (personnel, facilities, equipment, funds) and other relevant information. The internal auditor meets with the senior officer directly responsible for the unit under review and any staff members s/he wishes to include. It is important that the client identify issues or areas of special concern that should be addressed.



  • Preliminary Survey/Questionnaire

    In this phase the auditor gathers relevant information about the unit in order to obtain a general overview of operations. S/He meets with key personnel to reviews reports, files and other sources of information.



  • Internal Control Design

    The auditor will review the unit’s internal control structure, a process which is usually time-consuming. In doing this, the auditor uses a variety of tools and techniques to gather and analyze information about the operation. The review of internal controls helps the auditor determine the areas of highest risk and design tests to be performed in the fieldwork section. CSU Internal Audit has adopted flow-charting and Risk/Control Matrices as the tools to evaluate the design effectiveness of the Internal Control structure. Copies are given to the client for their use, future reference and training needs.



  • Prepared by Client (PBC) Listing

    This is a document that is prepared by Internal Audit which documents the items that are needed to complete the audit. Items such as reports, vouchers, meeting minutes, policies and procedures are just a few that would be on this listing.



  • Audit Program

    Preparation of the audit program concludes the preliminary review phase. This program outlines the fieldwork necessary to achieve audit objectives.



  • Fieldwork

    The fieldwork concentrates on transaction testing and informal communications. It is during this phase that the auditor determines whether the controls identified during the preliminary review are operating effectively and in the manner described by the client. The fieldwork stage concludes with a list of significant findings from which the auditor will prepare a final draft of the audit report.




  • Download 437.69 Kb.

    Do'stlaringiz bilan baham:
  • 1   2   3   4   5   6   7   8   9   10   ...   16




    Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
    ma'muriyatiga murojaat qiling