77 
Total
 


10 
Indeterminable – insufficient data 
 
 
 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
78 
Table 19: Aquifer and GDE risk assessment 
(Corresponds to Table 7: Aquifer and GDE risk assessment (Kuginis et al 2012) 
Exception rule: If the number of unknowns exceed 50 percent of questions, the risk is considered to be high until proven otherwise. 
Aquifer Name: Lot 18, Diamond Beach 
Risk factors 
 
 
High
 
Moderate
 
Low
 
Insufficient 
data or 
unknown
 
Water quantity asset 
 
What will be the risk of a change in groundwater 
levels/pressure on GDEs?
 
Reduction in groundwater 
level(s) or piezometric 
pressure beyond seasonal 
variation, resulting in 
permanent loss or alteration of 
defined habitat type.
 
Reduction in groundwater 
level(s) or piezometric 
pressure beyond seasonal 
variation, resulting in 
temporary loss or alteration of 
defined habitat type.
 
No change to aquifer water 
levels or pressure.
 
 
What will be the risk of a change in the timing or 
magnitude of groundwater level fluctuations on GDEs?
 
Fluctuation in groundwater 
level(s) or piezometric 
pressure beyond established 
seasonal variation, resulting in 
permanent loss or alteration of 
defined habitat type.
 
Fluctuation in groundwater 
level(s) or piezometric 
pressure beyond seasonal 
variation, resulting in 
temporary loss or alteration of 
defined habitat type.
 
No change in timing of water 
level fluctuations.
 
 
What will be the risk of changing base flow conditions on 
GDEs?
 
Permanent reversal of base 
flow conditions.
 
Temporary reversal of base 
flow  conditions  exceeding 
seasonal variation.
 
No change in direction of flow.
   
Water quality asset 
 
What is the risk of changing the chemical conditions of 
the aquifer?
 
Permanent change; eg. in pH, 
DO, nutrients, temperature and 
/ or turbidity.
 
Temporary change; eg. in pH, 
DO, nutrients, temperature and 
/ or turbidity.
 
Negligible change (<5%).
 
 
What is the risk on the aquifer by a change in the 
freshwater/salt water interface?
 
Permanent change in location 
or gradient of salt / freshwater 
interface.
 
Temporary change in location 
or gradient of salt / freshwater 
interface.
 
No change or not applicable
 
 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
79 
What is the likelihood of a change in beneficial use (BU) 
of the aquifer?
 
Reduction in water quality 
beyond designated BU 
category (for identified trigger 
parameters).
 
Reduction in water quality 
within designated BU category 
(for identified trigger 
parameters).
 
Negligible change for identified 
triggers (<5%).
 
 
 
Aquifer Name: Lot 18 363 Diamond Beach Rd, Diamond Beach 
 
Risk factors 
 
 
High
 
Moderate
 
Low
 
Insufficient 
data or 
unknown
 
Aquifer integrity asset 
 
What is the risk of damage to the geologic structure?
 
Permanent destruction of the 
aquifer matrix. Major 
cracking/fracturing of the 
bedrock/stream bed leading 
complete dewatering of the 
GDE.
 
Temporary adjustment to the 
aquifer matrix. Minor 
cracking/fracturing of the 
bedrock/stream bed leading to 
partial dewatering of the GDE.
 
No change
 
 
 
Biological integrity asset 
 
What is the risk of alterations to the number of native 
species within the groundwater dependent communities 
(fauna and flora)?
 
> 10% reduction in No. of 
species.
 
10 to 5% reduction in No. of 
species.
 
No reduction in No. of species.
   
What is the risk of alterations to the species composition 
of the groundwater dependent communities (fauna and 
flora)?
 
> 10% change in species 
composition.
 
10 to 5% change in species 
composition.
 
No change in species 
composition.
 
 
What is the risk of increasing the presence of exotic flora 
or fauna?
 
Large populations of one or 
more species.
 
Species in small numbers.
 
None exist.
 
 
What is the risk of removing or altering a GDE subtype 
habitat; eg. quarrying of limestone around karsts, 
tramping of cave habitats, sand and gravel extraction?
 
> 20% removal or alteration of 
habitat area.
 
10 to 20% removal or 
alteration of habitat.
 
No removal or alteration of 
habitat.
 
 
Risk valuation
 




Risk                                          
 
High as >6 unknowns. 
*Note: Methods to determine magnitude or degree of alteration will depend on the criteria and habitat type being monitored. A discussion on these methods is outside the scope of this document. 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
80 
 The Risk Matrix 
The risk matrix is the final stage of the GDE risk assessment process (Kuginis et al 2012). The risk 
matrix (Figure 9) is a component of adaptive management and is designed to: 
1.  Recommend the most appropriate management strategies for each given scenario at the outset. 
2.  Test  the  effectiveness  of  the  management  strategies  over  a  time  period  by  combining  a 
monitoring program with an effective framework for adaptive management ie. responding to the 
monitoring outcomes. 
The aim of the recommended management strategies is to: 
1.  Maintain and / or improve the ecological value of an aquifer and its associated GDEs  
2.  To reduce the level of risk to that aquifer and associated GDEs. 
The management strategies for an aquifer and its associated GDEs or for individual GDEs are based 
on the comparison of the ecological value of the aquifer and its associated GDEs against the risk to 
them  by  the  proposed  or  current  activity.  The  risk  is  a  combination  of  the  likelihood  that  an  altered 
groundwater regime or water quality will impact adversely on the ability of the asset to access sufficient 
groundwater  or  sufficient  quality  to  meet  its  requirements  and  the  degree  of  threat  posed  to  the 
groundwater by the proposed or current activity. 
The application of the risk matrix can be applied to either an aquifer ecological evaluation using Table 
3 or an individual GDE ecological valuation using Table 2 of the guidelines (Kuginis et al 2012). 
The  results  of  the  above  GDE  analysis  for  the  two  vegetation  communities  on  site  determines  the 
following for the risk matrix assessment: 
• 
The GDE PCT ID 1064 Paperbark swamp forest of the coastal lowlands of the NSW North Coast 
Bioregion  and  Sydney  Basin  Bioregion  within  the  survey  site  of  Lot  18  is  in  the  C  portion 
(Category 1 HEV and Category 3 High Risk). 
• 
The GDE PCT Id 1704 - Fern-leaf Banksia - Prickly-leaved Paperbark-Tantoon - Leptocarpus 
tenax wet heath on coastal sands of the Central Coast and lower North Coast within the survey 
site of Lot 18 is in the C portion (Category 1 HEV and Category 3 High Risk). 
These are applied to the risk matrix to get the resulting management requirements and actions to avoid 
or mitigate impacts on the GDEs on site. 
 
 
 
 
 
 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
81 
Figure 9: GDE Risk Matrix
 
 
Risk matrix 
 
Category 1 
 
High Ecological Value (HEV) 
Sensitive Environmental Area (SEA) 
Category 2 
Moderate Ecological Value (MEV) 
 
Sensitive Environmental Area (SEA) 
 
 


C 
 
 
 
 


F
 
 
Category 3 
 
Low Ecological Value (LEV) 


I 
 
 
Category 1. 
 Low Risk 
 
 
 
 
 
Category 2. 
Moderate Risk 
Category 3. 
High Risk

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
82 
Table 20: Risk matrix management actions 
(Corresponds to Table 8: Risk matrix management actions for each matrix box (Kuginis et al 2012) 
As both vegetation communities are HEV and High Risk, they fall into C. 
Risk matrix 
box
 
Descriptor
 
Management action short term
 
Management action mid term
 
Management action 
long term **
 
A
 
High value / low risk
 
Protection measures for aquifer and GDEs.
 
Continue protection measures for aquifers and GDEs.
 
Adaptive 
management. 
Continue monitoring.
 
Baseline risk monitoring.
 
Periodic monitoring and assessment.
 
B
 
High value / moderate Risk
 
Protection measures for aquifer and GDEs.
 
Protection measures for aquifer and GDEs.
 
Adaptive 
management. 
Continue monitoring.
 
Baseline risk monitoring. Mitigation action.
 
Monitoring and periodic assessment of mitigation.
 
C
 
High value / high risk
 
Protection measures for aquifer and GDEs.
 
Protection measures for aquifer and GDEs.
 
Adaptive 
management. 
Continue monitoring.
 
Baseline risk monitoring. Mitigation.
 
Monitoring and annual *assessment of mitigation.
 
D
 
Moderate value / low risk
 
Protection of hotspots.
 
Protection of hotspots.
 
Adaptive 
management. 
Continue monitoring.
 
Baseline risk monitoring.
 
Baseline Risk monitoring.
 
E
 
Moderate Value/Moderate 
Risk
 
Protection of hotspots.
 
Protection of hotspots.
 
Adaptive 
management. 
Continue monitoring.
 
Baseline Risk monitoring.
 
Monitoring and periodic assessment of mitigation.
 
Mitigation action.
 
 
F
 
Moderate Value/High Risk
 
Protection of hotspots.
 
Protection of hotspots.
 
Adaptive 
management. 
Continue monitoring.
 
Baseline Risk monitoring. Mitigation Action.
 
Monitoring and annual *assessment of mitigation.
 
G
 
Low value/Low risk
 
Protect hotspots (if any).
 
Protect hotspots (if any).
 
Adaptive 
management. 
Continue monitoring.
 
Baseline Risk monitoring.
 
Baseline Risk monitoring.
 
H
 
Low Value/Moderate Risk
 
Protect hotspots (if any).
 
Protect hotspots (if any).
 
Adaptive 
management. 
Continue monitoring.
 
Baseline Risk monitoring. Mitigation action.
 
Monitoring and periodic assessment of mitigation.
 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
83 
Risk matrix 
box
 
Descriptor
 
Management action short term
 
Management action mid term
 
Management action 
long term **
 
I
 
Low Value/High Risk
 
Protect hotspots (if any).
 
Protect hotspots (if any).
 
Adaptive 
management. 
Continue monitoring.
 

Annual assessment of mitigation or as deemed necessary based on GDE type. 
** 
It is anticipated that that the monitoring actions and management will change in light of observed GDE responses. The triggers for management responses will vary depending on GDE type and 
WSP. Therefore, this is outside the scope of this document. 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
84 
Both communities are HEV and High Risk, hence the following two management requirements 
and  actions  (as relevant to  the  development type)  are  required  to  achieve  the  target result for 
these categories: 
Table 21: Management requirements and actions 
(Corresponds to Table 9: Management requirements and actions associated with each level of ecological value and 
risk (Kuginis et al 2012) 
Criteria
 
Assumptions
 
Management 
requirement
 
Management action
 
Results of 
management action 
(arrows indicate 
desired directions of 
outcomes)
 
HEV
 
All of ecosystem is of 
high value. 
Ecosystem in good 
condition.
 
Protection of aquifer 
and GDE catchment 
subcatchments.
 
Management actions 
(water sharing plan 
rules).
 
Status Quo
 
Monitoring to ensure 
no change to risk.
 
No further action 
required.
 
 
Protection of entire 
aquifer and catchment.
 
MEV
 
Elements of 
ecosystem has 
value.
 
Protect valued assets 
including aquifer and 
GDE vicinity.
 
Management actions 
(water sharing plan 
rules).
 

 
Ecosystem in good 
to fair condition.
 
Mitigation to improve 
impacted assets.
 
Mitigation actions.
 
 
Protection of identified 
assets.
 
 
Rehabilitation where 
necessary.
 
Criteria
 
Assumptions
 
Management 
requirement
 
Management action
 
Results of 
management action 
(arrows indicate 
desired directions of 
outcomes)
 
LEV
 
Low ecological value 
and highly impacted.
 
Rehabilitate both 
aquifer water levels 
and surrounding 
catchment (where 
appropriate).
 
Management actions 
(water sharing plan 
rules).
 

 
 
Mitigation actions.
 
Protect of identified 
assets.
 
Rehabilitation where 
necessary.
 
High Risk
 
Risk is substantial / 
permanent, 
occurring now, or 
imminent.
 
Immediate action.
 
Mitigate impact  and 
apply water sharing 
plan rules.
 

 
Monitor effectiveness 
of mitigation strategy 
using appropriate 
indicators.
 
Moderate 
Risk
 
Risk is 
likely/moderate, 
temporary or 
Immediate action.
 
Mitigate impact and 
apply  water  sharing 
plan rules.
 

 

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
85 
Criteria
 
Assumptions
 
Management 
requirement
 
Management action
 
Results of 
management action 
(arrows indicate 
desired directions of 
outcomes)
 
sporadic, seasonal.
 
Monitor effectiveness 
of mitigation strategy 
using appropriate 
indicators.
 
Low risk
 
Risk is unlikely, 
minor.
 
No mitigation action.
 
Continue to monitor 
selected indicator(s).
 
Status quo
 
Monitoring to ensure 
no change of risk.
 
 
 Conclusion 
The  outcome  from  application  of  the  GDE  risk  assessment  framework  to  the  two  GDEs 
present in the survey site of Lot 18 are: 
• 
Both  GDEs  are  determined  to  be  highly  dependent  on  groundwater  in  the  obligate  to 
proportional dependence range for the species comprising their respective communities 
and therefore the ecosystems as a whole; 
• 
The overall ecological value of the GDEs on Lot 18 is high (HEV); 
• 
Impact  from  the  proposed  development  is  considered  likely  if  potential  threats  are  not 
adequately mitigated by appropriate measures; 
• 
The overall risk to ecological value of the GDEs is high due to their sensitivity;  
• 
As a result of the above, management measures are required eg protection of aquifer and 
GDE catchment/subcatchments and monitoring to ensure no change to risk.  
The main risk to GDEs is considered to be the risk of changes in seasonal drawdown (essential 
to  communities  which  need  a  dry  period)  and  hydro-chemical  changes  due  to  nutrient  inflows 
from stormwater and on-site effluent treatment.  
A future re-development proposal may pose these risks as the expanded footprint will create a 
substantial  area  of  new  hard  surfaces  which  will  shed  larger  amounts  of  water  and  increasing 
surface  runoff  rates  during  heavy  rainfall  events  which  exceed  the  currently  high  infiltration 
capacity of the local catchment. This will see a reduction in the local catchment’s in situ infiltration 
capacity, and with less capacity in the dam (which will be reduced in size and hence buffering 
capacity in terms of storage), there is a risk of more regular overflows into the wet heath.  
While both GDEs are tolerant of waterlogged soils, this is only on a seasonal basis which would 
tend to occur during the higher rainfall summer season in this area. These GDEs require some 
periods of  drier soil conditions to  survive.  Heath communities in particular  can be regarded as 
fragile communities such that any small changes in the water-balance, soil nutrients or fungi, can 
alter  the  vegetation  within  short  time  frames.  Hence  directing  more  water  to  this  area  via 
stormwater  above  the  natural  regime  could  see  gradual  shifts  in  the  current  character  of 
vegetation assemblage eg to another GDE type. 
  

 
Ecological Assessment | Rezoning – Lot 18 Diamond Beach Rd, Diamond Beach | January 2015 
 
 
86 
Heath ecosystems are also highly adapted to infertile, low nutrient soils. A large number of their 
constituent species (up to 80%) have some form of adaption or mechanism for nutrient uptake in 
these  low  nutrient  circumstances.  Adaptions  like  proteoid  roots,  mycorrhizal  associations  and 
nitrogen fixing symbioses allow efficient uptake of small quantities of nutrient present in sandy 
soils.  An  intensification  of  habitation  on  Lot  18  has  the  potential  to  increase  nutrient  levels 
substantially  via  on-site  effluent  systems,  piped  stormwater  point  sources,  fertiliser  runoff, 
importation of fill soil, dog/cat faeces, car wash detergents etc. They may flow across the land 
surface or via stormwater infrastructure in solution and enter the dam which is likely to be currently 
functioning  with  its  macrophytes  as  a  constructed  wetland,  absorbing  some  of  the  nutrients, 
before  they  flow  through  into  groundwater  into  the  adjacent  vegetation  communities.  Elevated 
nutrient  levels  in  the  adjacent  heath  can  be  toxic,  hamper  growth  and  support  weed 
establishment.  Elevated  nutrients  in  the  dam  can  also  lead  to  algal  blooms  with  associated 
impacts on water quality and nutrient cycles. Any future development proposal must demonstrate 
effective  controls  to  maintain  the  current  nutrient  loads  and  cycles,  and  that  stormwater  is 
effectively managed before it enters the GDEs.  
The above clearly illustrates that for the development to proceed, it must demonstrate effective 
stormwater and nutrient management, and water-sensitive urban design (WSUD) solutions. This 
may also include some form of monitoring to detect and act on adverse changes as part of an 
adaptable management regime.  
For  any  future  development  proposal  for  the  site,  appropriate  stormwater  modelling  will  be 
required to demonstrate a significant change to stormwater runoff is not likely to eventuate. Such 
assessment would be required to be carried out at the development application stage.  
7.0 Conclusion 
The assessment has determined that the two native vegetation communities on the western end 
of the site are GDEs, but not EECs, and do not appear to support any threatened flora. 
A few threatened fauna species may at least have some periodic use of this habitat as part of 
their local range, but historical disturbance, fragmentation and edge effects discounts the 
likelihood of small home range species being present and being highly dependent on the site 
habitat. 
The survey area vegetation is also Potential Koala Habitat, but not Core Koala Habitat. 
Nonetheless, it has potential value as a stepping stone for Koalas moving across the wider 
area. The site is also within a Regional Corridor, but has limited local corridor and habitat link 
value due to the extent of agricultural and residential development. 
The GDEs on site have High Ecological Value and are also considered particularly vulnerable to 
impacts on nutrients and watertable changes. Any future development proposal thus must 
demonstrate appropriate design and engineering mechanisms to mitigate these impacts and 
maintain the current hydrological regime. 
  
 
Download 0.87 Mb.

Do'stlaringiz bilan baham:
1   ...   13   14   15   16   17   18   19   20   21




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling