Project Management in the Oil and Gas Industry


Download 1.92 Mb.
Pdf ko'rish
bet112/176
Sana20.10.2023
Hajmi1.92 Mb.
#1713235
1   ...   108   109   110   111   112   113   114   115   ...   176
Bog'liq
2.Project management in the oil and gas industry 2016

Clarification
Owner
 Owner responsibilities 
Reach the site
Deliver information and document
Owner Representative
 Engineer 
Engineer representative 
Roles and responsibility 
Requirements and conditions
Contractor
 General responsibilities Guarantee
Contractor Representative 
Subcontractor
Engineering Design
 General responsibilities 
Project specification 
Drawings


198 
Project Management in the Oil and Gas Industry
Supervision and Labors
 Labor rules 
Labors salary 
Health and safety
Equipment and Materials
 Construction procedure 
Tests
Time Plan
 Start time 
End time 
Performance rate oPenalty
Tests
 Contractor responsibilities 
Testing procedure and condition
Receive Projects
 Receiving certificate 
Operations manual to the owner
Fault Responsibility
 Cost of repair 
Tests after repair
Contract Value and Payment
 Contract value 
Down payment 
Payment schedule
Change Order
 Right to change 
Methods of change 
Present change
Value of change
Contractor Fault
 Excuse 
Contract termination 
Pay at completion
Insurance
 On design 
Equipment 
Labours oOthers
Force Major
 Definition 
Effects
Exemption from the delay and performance
Disputes and Arbitration
 Method claim 
Payment of the claim 
Arbitration
Determine the courts in case of conflict
The laws governing the conflict
6.8 Arbitration and the Arbitrator
Arbitration is defined as an agreement to present the dispute between two 
parties to a particular person or persons designated to provide a solution 
to this conflict instead of going to the courts.


Tendering, Bidding, and Contract Traps 199
In engineering projects, turning to arbitration as the dispute between the 
owner (employer) and the contractor or the employer, consultant, has a spe-
cial nature in most cases and requires special expertise, both technical and 
legal, as the general interest of all parties is to end dispute in the shortest pos-
sible time because an increase in time negatively affects the whole project.
Partial arbitration, when the problem is between the owner and the con-
tractor, is raised and presented to the consultant engineer, who will act as a 
judge, and the technical and administrative arbitration will be done by him. 
This is the first step to stop the conflict between the owner and the con-
tractor. So, in this case, a competent consultant engineer who has strong 
experience and the capability to solve these problems will be very essential.
FIDIC contracts play a vital role and give power to the consultant engineer 
when there is a requirement for the contractor. Therefore, the first and most 
important step is to resolve the problem before it goes to the arbitration step.
Under the terms of FIDIC, the consultant engineer should be within 
84 days from the date for receiving an order from any one of the parties in 
the conflict and the owner or the contractor should submit his decision by 
written document.
This decision is enforceable even though it may not be final and the 
Download 1.92 Mb.

Do'stlaringiz bilan baham:
1   ...   108   109   110   111   112   113   114   115   ...   176




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling