Project Management in the Oil and Gas Industry
Calculate the Activity Time Period
Download 1.92 Mb. Pdf ko'rish
|
2.Project management in the oil and gas industry 2016
3.4 Calculate the Activity Time Period
The calculation of the activity period requires taking data from different disciplines, but its accuracy depends on the skill and strong experience of the planner. On the other hand, there is a performance rate for each activ- ity and, in international contractor companies, usually have a standard guide for the performance rate for each activity. There are many factors that affect labor productivity: • Job size and complexity • Job site accessibility • Labor availability • Equipment utilization • Contractual agreements • Local climate • Local cultural characteristics, particularly in foreign operations. There is a method for calculating the time of an activity through the use of performance rates. Below shows the method of calculating the period of time to excavate 15000 m 3 , and this requires, first, determining the method of excavation. In this example, it has been identified by the equipment. Assume you need to excavate 15000 m 3 of soil. Using two bulldozers and loaders and trucks to transport the disposal will be the method of excava- tion. The equipment used will be two bulldozers, two loaders, and four trucks. The performance rate for one bulldozer is 120 m 3 /hour and the performance rate for one loader and two trucks is 75m 3 /hour. The rate of excavation is 2 × 120 = 240 m 3 /hour. The required time for excavation is 15000/240 = 62.5 hours = 9 days. The rate for removing disposal is 2 × 75 = 150 m 3 /hour. The time period for removing disposal is 15000/150 = 100 hours = 15 days. Therefore, the excavation time equals about nine days and the trans- fer of residue is approximately fifteen days, taking into consideration that the number of working hours in the day equals only seven hours in the 94 Project Management in the Oil and Gas Industry preparation of the timetable. For the excavation activity, take the largest time period which is fifteen days. It may be after finishing the excavation to start pouring the plain concrete, so it will start after nine days, as there is no need to wait pouring the concrete until the transfer of all waste from the site is completed. Download 1.92 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling