Table of contents introduction


Download 263.72 Kb.
bet72/77
Sana22.11.2023
Hajmi263.72 Kb.
#1794484
1   ...   69   70   71   72   73   74   75   76   77
Bog'liq
Тех процес 1 INGLIZCHA

4. Working conditions.
Shift work, duration 12 hours. From 8.00-20.00 day shift (1st shift). From 20.00-8.00 night shift (2nd shift), weekly rest days are determined by the duty schedule. Lunch, according to technological breaks, but at least 2 times for 30 minutes per shift. Vacation, according to the “Schedule of plant employees going on vacation.”


Documentation
Rules for technical operation of railways. Instructions for signaling on railways: instructions for drawing up a full-scale sheet (Form DU-1) railway diagram; alphabetical list of railway stations indicating a single network markup; table numbering wagons of the freight fleet; Rules for the transportation of oversized and empty cargo on conveyors on railways; train formation plan.

  1. Requirements for the performer.

To ensure smooth and uninterrupted operation of the station and traffic safety, the departure station operator must know:


-PTE, IDP, ISI and periodically pass exams in knowledge of them;
- job description of the STC operator for dispatch;
- TPA station and the technological process of the station in terms of the work of the STC operator for dispatch;
- local instructions for shunting work with dangerous goods;
- local occupational health and safety instructions;
- local instructions for the operation of the hump;
- labor code of the Republic of Uzbekistan;
- orders, instructions from the management, the company's management and station management on train movement, shunting work and safety precautions;
- unified network and conventional marking of cargo documents accepted at the station;
- numbering of cars;
- rules of cargo transportation;
- formation plan;
- diagram and atlas of railways;
- alphabetical list of railway stations;
- instructions for encoding source information;
- technological schedules for train processing;
- instructions for drawing up a full-scale sheet;
- tables for determining the tare weight and the nominal length of the rolling stock;
- current empty train formation plan;
- regulations on discipline of railway transport workers;
- basic forms of information messages;
- be able to transfer them via computer to TsSIVT, as well as make requests for certificates from the computer.



Download 263.72 Kb.

Do'stlaringiz bilan baham:
1   ...   69   70   71   72   73   74   75   76   77




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling