Unit 8. Production Planning and Workflow production planning


Lean Manufacturing https://www.youtube.com/watch?v=wfsRAZUnonI


Download 0.54 Mb.
bet2/3
Sana04.02.2023
Hajmi0.54 Mb.
#1160879
1   2   3
Bog'liq
PP48.1 Production Planning and Workflow

Lean Manufacturing

https://www.youtube.com/watch?v=wfsRAZUnonI


Four Principles Lean Management 

WORK FLOW

  • Moving Material
  • Plant Capacity
    • Capacity of a process is the maximum rate at which inputs can be transformed to create outputs
  • Design Capacity
    • The target rate at which the facility is designed to operate
  • Effective Capacity
  • Actual Output
    • The amount of production in a given period
  • Bottlenecks
    • Point at which the production rate restricts the flow of materials

WORK FLOW

  • Arranging Facilities
    • Facility Layout
    • Production Layout
      • Moves large volumes of material in a sequence to produce standardized goods
    • Process Layout
      • Groups similar functions into work stations
    • Fixed-Position Layout

WORK FLOW

  • Cellular Manufacturing
    • A combination of process and product layouts. More flexible because machines can be moved into and out of cell. Team is responsible for all aspects of the product. They lend themselves to customization of standard products to meet specific customer needs
  • Line Balancing
    • Process of deciding how to assign groups of tasks to workstations

https://www.youtube.com/watch?v=WmAwcMNxGqM
Cycle Time Video

Download 0.54 Mb.

Do'stlaringiz bilan baham:
1   2   3




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling