JOB SAFETY ANALYSIS (JSA)






JOB SAFETY ANALYSIS (JSA)/ ISHNING XAVFSIZLIK TAHLILI

JSA No:
DATE / SANA
REVISION NO / REVIZIYA RAQAMI:
AUTHORISATION: (Team Leader / Coordinator / Supervisor)
JAVOBGARLAR (Guruh rahbarii/ Kordinator/Supervizor)
Signed/Imzo:________________________________
Approved by HSE/ SX,MM va AMM bo’limi tasdiqlandi:

Date/Sana;



JSA TEAM MEMBERS/ IXT JAMOASI




Signed : (JSA Team Leader)
Imzo (IXT jamoasi rahbari)

JOB DESCRIPTION : Work at height
ISH TA'RIFI: Balandlikda ish bajarish

JOB LOCATION: UZGTL Plant
Ish joyi: UZGTL zavodi



WORK TEAM MEMBERS

PERSONAL PROTECTIVE EQUIPMENT REQUIREMENTS

PLANT, EQUIPMENT & TOOL

ISOLATION, TAGGING, BARRICADES, SIGNS & LICENSES

Environmental Controls (Bunding, Waste Disposal, Discharge Prevention, etc)




Name
Ismi

Signature
Imzo

Basic PPE
Asosiy himoya vositalari

Keys
Kalitlar (uchqun chiqarmaydigan ish qurollari)

Barricades
Himoya to’sig’i













Full body harness
Xavfsizlik kamari

Scaffolding or work platform
Havoza yoki ish platformasi

Sign boards
Ogohlantiruvchi belgilar













Double languard
Ikki tomonlama ilgak

Main lift
Yuk ko’targich(подёмник)

Information on the fact that the lift was tested
Liftni sinovdan o’tkazilganligi to’g’risida ma’lumot
















Main basket
Yuk ko’targich Lyulka

Information on the fact that the basket was tested
Luylkani sinovdan o’tkazilganligi to’g’risida ma’lumot










No

Job Step
Ishning qadami

Hazard
Xavf-hatar

Consequences
Oqibati

Control Measures
Ko’riladigan chora tadbirlar

1

Work Preparation
Erection of scafolding
Position of tools
Ishga tayyorgarlik
Havozani ornatish
Asboblarning joylashishi



  • Unauthorized entry into work area

  • The danger zone is not limited

  • Not aware about the hazards

  • involved in the task

  • Emission of harmful gases or vapors into the workplace

  • Scafolding, safety belt is not unusable

  • Slip, trip, fall

  • Extreme (low or high) temperatures

  • Availability of electrical equipment, mechanisms, air and steam pipes in the closed area

  • bad working posture

  • Tools falling.

  • scaffolding poles falling

  • scaffolding poles lutting adjacent equipment

  • Ish zonasiga ruhsatsiz kirish

  • Xavfli hudud chegaralamagan.

  • Ish bilan bog'liq xavflari bilan tanishilmagan

  • Zararli gazlar yoki bug'larni ish joyigapaydo bo’lishi

  • Xavoza , xavfsizlik kamari ishlashga yaroqsiz

  • Toyib ketish, yiqilish.

  • ekstremal (past yoki yuqori) haroratlar

  • Yopiq hududda elektr jihozlari, mexanizmlar, havoza va bug ' quvurlarini mavjudligi

  • noqulay ish holati

  • Ish qurollarinin yuqoridan tushishi

  • Havoza ustunlarini qulashi

  • Havoza ustunlarini qo’shni uskunalarga o’rnatish.




  • Personnel Injury

  • Fatigue

  • Property damage




  • O Only authorized personnel will be allowed to enter and working under PTW

  • Areamust be barricaded and install sign board

  • Hazards & risk be discussed in Tool Box Meeting.

  • All access and egress points must be identified properly.

  • Ensure safe access

  • Сonduct an inspection,

  • Do not allow the use of demaged belts

  • Ensure proper housekeeping

  • Scaffolding to have toe boards

  • Scaffolding to have drop bar at access ladders

Havozaning is bajarish poli toliq tugallansin


  • aqat naradga va ishga aloqador kishilar kirishi mumkin

  • Xudud tusiqlar bilan to’silsin va kuzatuvchi eslatmalar o’rnatilsin.

  • Xodimlarga yo’l yo’riq o’tilsin xavflar va risklar muhokama qilinsin.

  • Kirish va chiqishda joylari belgilansin.

  • Kirish uchun xavfsizlik ta’minlansin.

  • Xavozalarni ko'rikdan o’tkazilsin yaroqsiz havozada ish bajarilmasin.

  • Yaroqsiz kamarlardan foydalanishga ruxsat berilmasin.

  • Ish joyi tozalansin..

  • Havoza poli chetlari taxta bilan to’silsin(бортовка)

  • Zinalaridan havoza platformasiga o’tish joylarida itarib ochiladigan tosiq bo’lishi shart

  • Scaffolding to have to complete floor




2

Installation of additional lighting in the work area (Poor lighting Illumination)
Ish joyiiga qo’shimcha yoritgichlar o’rnatish.
(Yetarlicha yoritilmaganligi)



  • Slip, trip and fall

  • Hit

  • Burns

  • Electrocution

  • Toyib ketish, yigilish, turtinib

  • tok urish

  • kuyish

  • Elektr tokidan jarohatlanish

  • Personnel Injury

  • Property damage

  • Mulkga zarar yetishi

  • Xodimning jarohatlanishi




  • Arrange proper and sufficient lighting in work area and in access ways

  • Use intrinsically safe and explosion-proof cables and lamps

  • Ish joyi va o'tish joylari yetarlicha yoritilishi bilan ta'minlansin

  • Portlashdan himoyalangan yoritgichlar va kabellardan foydalanilsin.

3

Working at height
Balandlikda ishlash

  • Untrained personnel

  • Fall from height Scaffolding not approved for use

  • and safety belt is unusable

  • Scaffolding not approved for useand safety belt is unusable


  • Falling objects from height

  • frozen, damp and slippery work area

  • safety belt and laggards in poor condition

  • Inadequate tie off points

  • Inadequate free fall space

  • O’qitilmagan xodim

  • Balandlikdan yiqilib ketish

  • Xavoza va xavfsizlik kamari ishlashga yaroqli emas.

  • Jismlarning tushib ketishi

  • Muzlagan, nam va sirpanchiq ish joyi.

  • Xavfsizlik kamari va tasmalari yomon holatda

  • Ulanish joylari xavfsizlik talablariga mos emas.

  • Kamar arqoni o’lchamiga nisbatan etarli bo'shliq mavjud emas.




  • Personnel injury


  • Xodimning jarohatlanishi

  • Only adequately trained personnel will be allowed to do the job Before start the job worker should be check scaffolding tag to engine than scaffolding to approved for use

  • If red tag or no tag do not use.

  • Fall protection and tie off required when working at more than 1.5 m height

  • Always wear Full Body Harness while at elevated area

  • Сheck the harness test dute. harness must be less than 1 years old

  • Tie off point must be sufficient for 5000 N force.

  • Do not use pipes cable trays, or platform handrails as tie off points

  • Tie off point must be at least 3.5 m above grade to avoid personnel impact with grade cutting a tall

  • Connect the snap hook to a rigid object while at elevated area.

  • .

  • Ensure proper lighting Avoid working at elevated area during rain and snow fall

  • Wait till the platform is dry after rain and snow fall


  • Fall arrest equipment should be checked for excessive wear or damage before each use.

  • Use a harnesse tape that fits snugly and comfortably.

  • Use appropriate shock absorption systems.

  • Safety harness must have double locking self-closing hooks. • .

  • Any fall protection equipment that is worn or damaged must be destroyed so that it is no longer used and then discarded. Seat belts, harnesses and straps that were used to stop falls must be destroyed and discarded.

  • At the end of each work, the safety belts must be stored in a dry cupboard by suspending from the dving.

  • Work tools should be stored in special bags. To avoid dropping team from the work platform

  • Objects and bags should not be stored at the edge of the work area Buyumlar va sumkalar ish joyining chetida saqlanmasligi kerak

  • Do not overload the work area. read scaffolding tag carefully to understand scaffolding load bearing limits.

  • Ishni bajarish uchun faqat tegishli tayyorgarlikdan o'tgan xodimlarga ruxsat beriladi

  • Ish boshlashdan oldin ishchi xodim havozani tekshirishi lozim

  • Agar qizil yorliq osilgan bo’lsa, yoku yorliq bo’lmasa ishni olib bormaslik lozim.

  • 1.5m balandlikdan yuqorida ishlaganda yiqilishna himoya qilinishi va kamar taqilish shart.

  • Balandlikda ishlaganda har doim to'liq xavfsizlik kamarlarini taqing

  • Xavfsizlik kamarlari qachon oxirgi marta sinovdan o’tganligini tekshiring.(yorliqda yozilgan bo’ladi)

  • Ulanish nuqtasi 5000 n kuch uchun yetarli bo'lishi kerak.

  • Kamarni ildirish nuqtalari sifatida quvurlar, kabel lotoklari yoki platforma tutqichlardan foydalanmang

  • Bog'lanish nuqtasi yerdan kamida 3,5 m balandlikda bo'lishi kerak, chunki yiqilganda boshqa narsalar bilan to'qnashuv kamaytirish oldinin olinishi shart.

  • Balandlikda ishlaganda, ilgakni qattiq va mustahkam narsaga ildiring

  • Yorug’likni yetarli darajada bo’lishini taminlang.

  • Yomg'ir va qor yog'ayotganda baland joylarda ishlashdan saqlaning

  • Yomg'ir va qor tushganidan keyin platforma quruq bo'lguncha kuting

  • Yiqilishni to'xtatuvchi uskunadan (xavfsizlik kamari va xavfsizlik kamari ildiriladigan po’lat arqon) har safar foydalanishdan oldin ko’zdan kechirish kerak.

  • Qulay va mos keladigan himoya tasmasini ishlating.

  • Zarbani yutuvchi tizimli (amartizatorli) xavfsizlik kamarlaridan foydalaning

  • Xavfsizlik kamarida ikki marta qulflanadigan ildiriladigan, ilgaklar bo'lishi kerak

  • Yiqilishdan himoyalash uskunalari (xavfsizlik kamari) shikastlangan bo’lsa uni qayta ishlatilmaslik uchun utilizatsiyaga yuborilishi kerak.

  • Yaroqsiz deb topilgan kamaklar arqonlari va tasmalari kesib tashlnishi va kamarlar yo'q qilinishi kerak.

  • Har bir ish oxirida xavfsizlik kamarlar shkafda quruq va osilgan holatda saqlanishi kerak

  • Ish asboblar platformadan tushib ketmasligi uchun maxsus yashiklarda saqlanishi kerak

  • Ish joyini ortiqcha yuklamang. Havoza yuk ko'tarish qobiliyati chegaralarini tushunish uchun havoza yorliqlarini diqqat bilan o'qing

4

Territory housekeeping by work completion
Ishni yakunlash bo'yicha hududni tozalash

  • Personel injuries. .

  • Trip, fall.

  • Dust, ice, wet

  • Wrong wastes disposal.

  • .Fuel and Lubricants spillage

  • Yengil jarohatlar

  • Toyib yiqilish

  • chang, muz, nam

  • Chiqindilarni yo'q qilish

  • Yoqilg'i va moylash materiallarining to'kilishi




  • Personal Injury

  • Property damage

  • Mulkga zarar yetishi

  • Xodimning jarohatlanishi

  • Control by foremen, supervisors, safety engineers. .

  • Personal Protective Equipment (work clothes, safety shoes, helmet, glasses, gloves and other necessary PPE). ).

  • Regular, routine housekeeping and working place compulsory cleaning at the end of working shiftAll spillages should be immediately taken away by following instructions in MSDS and removing from site. .

  • Wastes must be disposed according to hazard classes. .

  • Special vehicles must be used for waste removal. Waste removal to specially allotted territory with utilization confirmatory documents upon delivery. .

  • Smena muhandislari, nazoratchilar, xavfsizlik muhandislari tomonidan nazorat

  • Shaxsiy himoya vositalari (ish kiyimi, xavfsizlik poyabzali, kaska ko'zoynak, qo'lqop va boshqa zarur shaxsiy himoya vositalari

  • . Ish davomida muntazam, ish oxirida muntazam ish joyini majburiy tozalash.

  • Barcha to'kilgan narsalarni MSDS belgilangnidek darhol tozalash va hududdan olib chiqilishini ta’minlash kerak

  • Chiqindilar havflilik sinfi bo’yicha ajraatish va yoqotish shart

  • Chiqindilarni olib tashlash uchun maxsus transport vositalari. Utilizatsiyani tasdiqlovchi hujjatlar asosida chiqindilarni maxsus ajratilgan hududga olib chiqish

5

Working in adverse weather condition (low or high temperature)
Noqulay ob-havo sharoitida (shamol, yog'ingarchilik, sovuq, issiqda) ishlash

  • Cold stress Heat stress

  • Overheating • sunburn• quyosh

  • coagulation in the rain

  • (sovuq urushi)

  • (issiq urishi)

  • haddan tashqari qizib ketish

  • yomg'irda koagulyatsiya




  • Frost bite

  • Hypothermia

  • Illness

  • Sovuq chaqishi

  • Gipotermiya

  • Kasallik

  • Use adequate PPE that protect from cold weather

  • Use several layers warm clothing.

  • Wear an ear band to cover the ear fully

  • Do not wear wet clothes

  • Provide warm drinks

  • Monitor breathing

  • Seek medical attention

  • Stop work when the wind speed exceeds the set norm

  • Protecting the work area from rain and wind and sun

  • Drink more water

  • Take a quick break

  • Sovuq havodan himoya qiluvchi tegishli shaxsiy himoya vositalaridan foydalanish

  • Bir necha qatlamli issiq kiyimdan foydalaning

  • Quloqni to'liq yopish uchun quloqchin taqing

  • Ho'l kiyim kiymang

  • Iliq ichimliklar bering

  • Nafas olishni kuzating

  • Tibbiy yordamga murojaat qiling

  • Shamol tezligi belgilangan me'yordan oshib ketganda ishni to'xtating

  • Ish joyini quyosh, yomg'ir va shamoldan himoya qilish

  • ko'proq suv iching

  • tez tez dam oling

6

Completion of work
Ishni yakunlash

  • Scattered materials / waste

  • chiqindilar

  • Personnel Injury

  • Property damage

  • Xodimlarni jarahotlanishi

  • Mulkga zarar yetishi




  • Ogohlantiruvchi lent ava belgilarni olish.

  • Tozalik – sinov uchun ishlatiladigan shlanglar va boshqa asboblarni to'g'ri tartibga keltirish va chiqindilarni tozalash.

7

Emergency situation
Attached is an evacuation plan.


Favqulotda holat.
Favqulotda vaziyatlarda evakuatsiya rejasi ilova qilinadi..

  • Plant

  • Fire

  • Spill

  • Gas release

  • Injure

  • Yong'in

  • To'kish

  • Gaz chiqish

  • Jarohat

  • Immediately stop work

  • if plant siren sounds

  • If you detect emerging situation, sounds

  • Turn off all power tools, shut off air compressor, welding machines

  • Take note of wind direction and evacuate to muster across wing

  • Darhol ishlashni to'xtating:

  • agar zavod sirenasi eshitilsa

  • Agar xavflu vaziyatni aniqlasangiz

  • Barcha elektr asboblarni o'chiring, havo kompressorini o'chiring, payvandlash mashinalarini o'chiring

  • Shamol yo'nalishiga e'tibor bering va yig'ilish nuqtalarini tomon harakatlaning


Mr. Timur Ismailov, GTL HSE Manager


Tel: +998 90 969 69 49 1115


Medical team walkie-talkie 1122
Tibbiyot xizmati 1122
HSE specialist walkie-talkie 1131
SX,MM va AMM bo’limi 1131
Firefighting specialist walkie-talkie 1112
Yong’in xavfsizligi xizmati 1112
Dispatch Tel: +998 907880099 1011
Dispetcher 1011
Radio channel №1
Ratsiya kanali №1

Download 141.09 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling