Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 153 E QUATOR P RINCIPLES IV (2020) Equator Principles IV (2020) require the E&S assessment and due diligence processes to evaluate the specific risks of projects and to apply the IFC Performance Standards under Principle 3. Due to the economic and physical displacement of the impacted herders as a result of the Project development, IFC Performance Standard 5: Land Acquisition and Involuntary Resettlement requirements are applicable to the Project. PS 5 recognizes that project-related land acquisition and restrictions on land use can have adverse impacts on communities and persons that use this land. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that leads to loss of income sources or other means of livelihood) as a result of project-related land acquisition and/or restrictions on land use. Where involuntary resettlement is unavoidable, it should be minimized and appropriate measures to mitigate adverse impacts on displaced persons and host communities should be carefully planned and implemented. The preparation of the Project specific Resettlement Action Plan (RAP) will also utilise the IFC PS Guidance Note 5: Land Acquisition and Involuntary Resettlement and the IFC’s Handbook on Preparing a Resettlement Action Plan. 5.14 Community Health, Safety and Security 5.14.1 National Requirements Resolution of Cabinet of Ministers of Republic of Uzbekistan No.95 “On approval of general technical regulations of environmental safety” (2020). Requires the implementation of environmental safety measures for the protection of flora and fauna. This includes the prevention of death of wildlife species due to magnetic fields of power transmission lines and sanitary protection zones. Requires transformer substations in power transmission lines, their grids to have equipment (barriers, fences etc.,) to prevent animals from entering the territory of the substation. Decree of the Cabinet of Ministers of the Republic of Uzbekistan No.1050 “On approval of Rules for Protection of Power Grid Facilities, 2018”. This determines the procedure for establishing protected zones for power grid facilities, as well as special conditions for using land located within the protected zones and ensure the functioning and operation of the said facilities. Construction of power grid facilities with 110, 220 or 500kV in protected areas of state nature reserves, protected areas of nature parks and state biosphere reserves etc shall be allowed with the permission of the Cabinet of Ministers of the Republic of Uzbekistan. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 154 Protected zones of power grid facilities shall be established on both sides of the power transmission line from the outermost wires and along the perimeter of substations at the following distances for voltages; 110kV: 20 meters; 220kV: 25 meters; and 500kV: 30 meters. San Rules & Norms No. 0236- 07 “Sanitary norms and rules to ensure safety for people living near high voltage power transmission lines, 2007”. This regulation sets the requirements for ensuring public safety when overhead power lines pass over populated, unpopulated or inaccessible territories. It requires sanitary norms and rules to be followed in the design, construction and operation of overhead power lines. The distances corresponding to the projection onto the ground of the outer phase wires in a direction perpendicular to the overhead line as follows: Up to 110kV/m: 10 meters; Up to 220kV/m: 15 meters; Up to 330kV/m: 20 meters; Up to 500kV/m: 30 meters; and Up to 570kV/m: 40 meters. Article 18 of the Air Code for the Republic of Uzbekistan This provides the details on the procedures to obtain permission to carry out activities that may pose a threat to flight safety. Chapter III sets out the necessary documents to obtain from the developer for constructing facilities located near civil aviation aerodromes. Aviation Regulation AP RUz -150 No.73 of 31.07.2006 According to Chapter IV, clause d, AP RUz-150, stationary objects with a height of 50m or more, regardless of their location, must be marked. Chapter V states that “ White lights operating in flashing mode can be used to illuminate freestanding obstacles located outside the airfield zones that do not have extraneous lights around them. The flash strength of the obstruction light must be at least 10 candelas (cd) and the flash rate must be at least 60 per minute.” Other requirements for equipping objects with light-shielding lights will be provided by CAA specialists study the coordinates of the objects (in the WGS- 84 system) and their technical characteristics. 5.14.2 Lenders Requirements EBRD Performance Requirement 4 establishes the importance of avoiding or mitigating adverse health and safety impacts and issues associated with project activities on workers, project affected communities and consumers. The objectives of EBRD PR4 are: Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 155 To protect and promote the safety & health of workers by ensuring safe and healthy working conditions and implementing a health and safety management system, appropriate to the relevant issues and risks associated with the Project. To anticipate, assess and prevent or minimise adverse impacts on the health and safety of project affected communities and consumers during the project lifecycle from both routine and non-routine circumstances. ADB Under ADB Safeguard Requirement 1: Environment, the assessment of community health and safety is required in ESIA. Specifically, ‘The borrower/client will identify and assess the risks to, and potential impacts on, the safety of affected communities during the design, construction, operation, and decommissioning of the project, and will establish preventive measures and plans to address them in a manner commensurate with the identified risks and impacts.’ This includes reasonably foreseeable incidents, accidents and natural impacts (due to the Project) and requires affected communities to be informed. Preparation are also required to be made to plan for such events. Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling