Table 2-2 Proposed OHTL Coordinates
ID
 
L
ATITUDE 
(N) 
L
ONGITUDE 
(E) 

40.871599° 
63.391602° 

40.873830° 
63.398702° 

40.872154° 
63.402109° 

40.888636° 
63.467480° 

40.893794° 
63.474995° 

40.968343° 
63.621198° 

40.988274° 
63.645815° 

40.998865° 
63.685715° 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
15 
ID
 
L
ATITUDE 
(N) 
L
ONGITUDE 
(E) 

41.003932° 
63.738973° 
10 
40.994481° 
63.811069° 
11 
40.988620° 
63.827835° 
12 
40.984832° 
63.969061° 
13 
40.966048° 
64.084599° 
14 
40.960308° 
64.214270° 
15 
40.944620° 
64.303214° 
16 
40.920831° 
64.364573° 
17 
40.854876° 
64.412343° 
18 
40.813571° 
64.474829° 
19 
40.816240° 
64.496930° 
20 
40.683620° 
64.626660° 
21 
40.659362° 
64.654167° 
22 
40.657243° 
64.668879° 
Figure 2-4 Alignment of 128.5km OHTL from the Dzhankeldy Wind Farm to Bash Site
The above OHTL alignment was approved by NEGU on 8
th
November 2021. 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
16 
2.2
Land Use and Site Condition
2.2.1 
Wind Farm 
2.2.1.1
Land Ownership 
According to the 1998 Land Code of the Republic of Uzbekistan, all land in Uzbekistan is state 
property and permits for use of land are granted and monitored by the State through the 
Rayon and Oblast administrations. 
According to the Land Allotment Order (see Appendix C) issued to the Project on 23
rd
March 
2021, the Peshku Municipality Mayor decided to “approve the decision of district commission 
(for Project realisation) to allocate land that belongs to district and allocate 280.0ha to “ACWA 
Power Dzhankeldy Wind ” LLC near Dzhankeldy village on basis of land allotment agreement 
considering the following: 
 
Change status of allocated land for the Project from category of “agricultural 
land” to the category of “industry, transport, communication and other”; 
 
Land lease agreement should be prepared based on rules and requirements of 
the investment agreement on “Construction of Bash wind power plant with 
capacity of 500MW in Peshku district, Bukhara region” and PPA agreement” 
Final approval of the decision will be obtained from regional municipality and final land 
allotment will be confirmed following receipt of final project layout (layout of wind turbines) 
when wind intensity surveys are completed (amongst other requirements).
Following issuance of the land allotment order, ACWA Power Dzhankeldy Wind LLC will enter 
into a Land Lease Agreement (LLA) with The Government of The Republic of Uzbekistan as 
represented by the Khokimiyat of Bukhara Region. 
Consultation with the State Committee for Land Resources, Surveys, Cartography and the 
State Cadaster (or Goskomgeodezkadastr) also confirms the above stated decision by the 
Peshku Municipality Mayor. The response from the State Committee for Land Resources is 
provided in Appendix D. 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   10   11   12   13   14   15   16   17   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling