Dzhankeldy Wind Power Project
ACWA Power: At the end of 2021. Committee for the Development of Sericulture and Wool Industry
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
- Bu sahifa navigatsiya:
- Committee for the Development of Sericulture and Wool Industry
- ACWA Power
ACWA Power: At the end of 2021.
Committee for the Development of Sericulture and Wool Industry: This means we have plenty of time to solve the lease agreement. You expect to sign the agreements by the end of the year right? ACWA Power: No, we plan to proceed with the lease agreements as soon as we finalise the Project layouts. Within two months we aim to finalise the layouts and discuss with the relevant national organisations. Committee for the Development of Sericulture and Wool Industry: We have completed the draft of Presidential Decree that empowers the Committee to regulate land issues allocated to the Committee by the State. I assume that this will be signed within two months after which we can sign lease agreements directly between the Committee and ACWA Power. ACWA Power: Understood. Pasture Development Association: We would like you to refer to us or inform us whenever you need to conduct surveys with the herders or discuss about the land issue. We could allocate a representative to assist your team to obtain the required information and we will remain informed about the Project status. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 22 ACWA Power: Agreed. We had not been informed the Committee and its regional depts are the main organisations to consult about the land and land use. We will keep you informed. P HOTOS After the meeting, further clarification was sought regarding the Presidential Decree (PD) No. 6059 (updated with PD 6259 dated 08.07.2021) which states “ all pastures specified in the target parameters for the development of karakul breeding in the Republic of Uzbekistan for 2021- 2025 are transferred to the permanent ownership of the Committee.” According to the Head of Karakul Association, this related to the activities such as breeding, grazing, production of wool, meat etc but not to the direct ownership of land. Hence, the Committee is able to issue land lease agreements to ACWA Power for the number of years required. On 20 th September 2021, ACWA Power sent a letter to the Bukhara Region Khokimiyat seeking clarification on whom the land lease agreement should be concluded with. The Bukhara Region Khokimiyat provided ACWA Power with a letter from Peshku District Municipality Mayor dated 20 th January 2020 and this letter states that “278 ha of land in Dzhankeldy massive (district) examined by representatives of Ministry of Energy has been taken into state reserve fund for construction of wind farm with total capacity of 500 MW by ACWA Power (Saudi Arabia) based on public-private partnership. We guarantee that indicated land will be allocated project construction ”. On 29 th September 2021, ACWA Power received a letter from Peshku Municipality Mayor indicating that land has been allocated to the Project based on internal order of Peshku Municipality issued under No. 227 on 23 rd March 2021 on ‘Allocation of Land for the Project’. This order was approved by order of Bukhara Region Mayor No.129 dated 23 rd March 2021. Based on the above and the allocation of land for project construction, the land lease agreements would be signed with Peshku municipality. On 30 th September 2021, Bukhara Region Khokimiyat provided ACWA Power with a response to the letter ACWA Power sent on 20 th September 2021. This letter states tha t “ As per paragraph 8 of Presidential Decree- 5001 on 23.03.2021 “On construction of wind power plant with a capacity of 300- 500 MW in Peshku district of Bukhara region”, local authorities are Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 23 obliged to allocate required land plots to Investing company for realisation of these projects. Based on the instructions given in PD- 5001 on 23.02.2021 “ACWA Power Dzhankeldy Wind” LLC as well as in signing investment agreement and PPA, Dzhankeldy municipality has allocated required 280 ha of land under the Mayor order No 129 dated 23 rd March 2021. Considering the above mentioned, we inform you that land lease agreement should be signed with relevant district municipality as per land allotment orders ”. Note: Based on the above summarized consultations, the land lease agreement (LLA) will be signed with Peshku municipality as per land allotment orders. See Appendix F for ACWA Power’s letter to Bukhara Region Khokimiyat seeking clarification on whom the land lease agreement will be signed with, letter from Peshku Municipality Mayor on transfer of land back to state reserve, letter from Peshku Municipality Mayor on Land Lease Agreement and letter from Bukhara Region Khokimiyat indicating the Land Lease Agreement should be signed with Peshku District Municipality. Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling