Dzhankeldy Wind Power Project


Minor  Natural Habitats (Stony slopes of relic  low mountains)  High  Moderate  Moderate to


Download 6.64 Mb.
Pdf ko'rish
bet169/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   165   166   167   168   169   170   171   172   ...   203
Bog'liq
56086-001-esia-en

Minor 
Natural Habitats (Stony slopes of relic 
low mountains) 
High 
Moderate 
Moderate to 
Major 
Natural Habitats (Steep Rocky slopes of 
relic low mountains) 
Medium 
Minor 
Minor 
Settlement and Wasteland
Low / Lower 
Minor 
Negligible to 
Minor 
Habitat loss impact can be further mitigated by post-construction restoration and 
compensatory offsets: 
 
Restore habitat post-construction in unused land areas that are not required for O&M 
maintenance; and
 
Compensatory offsets may be applied in adjacent degraded areas to restore and 
revitalize similar natural habitats subject to the findings of the Biodiversity Action Plan 
(BAP).
The EPC contractor shall commit to the post-construction restoration of all affected areas to 
natural habitat conditions. The exact scope and methodology will be detailed in a Restoration 
Action Plan. 
Further, a corresponding amount of Foothill and Stony slopes habitats that are lost will be 
compensated via protection and/or restoration of similar habitat in areas outside of the 
operational footprint. The exact locations shall also be determined in the Restoration Action 
Plan.
With post-construction restoration and compensatory restoration of the same amount of land 
and/or habitats as much as possible, the residual significance is Neutral to Minor.


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
230 
Table 7-13 Residual Significance of Habitat Loss
R
ECEPTOR
 
V
ALUE
/
 
S
ENSITIVITY
 
M
AGNITUDE

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   165   166   167   168   169   170   171   172   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling