Dzhankeldy Wind Power Project


Table 7-14 Significance of Vegetation Removal


Download 6.64 Mb.
Pdf ko'rish
bet171/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   167   168   169   170   171   172   173   174   ...   203
Bog'liq
56086-001-esia-en

Table 7-14 Significance of Vegetation Removal
R
ECEPTOR
 
V
ALUE
/
 
S
ENSITIVITY
 
M
AGNITUDE
 
S
IGNIFICANCE
 
Endangered Flora 
Very High 
Major 
Major 
Threatened & Protected Flora
High 
Major 
Major 
All Other Flora 
Low / Lower 
Major 
Minor to 
moderate 
 
 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
231 
Table 7-15 Significance of Earthworks Mortality
R
ECEPTOR
 
V
ALUE
/
 
S
ENSITIVITY
 
M
AGNITUDE
 
S
IGNIFICANCE
 
Non-threatened Mammals
Low / Lower 
Major 
Minor to 
moderate 
Southern Even-fingered Gecko 
Very High 
Major 
Major 
Russian Tortoise 
High 
Major 
Major 
Nationally Important Herptiles
Medium 
Major 
Moderate to 
Major 
Non-threatened Herptiles & 
Invertebrates 
Low / Lower 
Major 
Minor to 
moderate 
However, the following mitigation measures shall be implemented to reduce the impacts on 
floral species: 
 
Pre-construction survey to carry out in-situ protection where possible, and whole-
specimen translocation (during the peak spring season, chiefly March) for 
threatened flora; 
 
Seed-collection of endangered, threatened and near threatened flora (during the 
peak season, chiefly March) such as Acanthophyllum cyrtostegium(UzbRDB VU), 
Calligonum zakirovii (UzbRDB EN), Eremurus korolkowii (UzbRDB VU), Ferula 
kyzylkumica (UzbRDB VU), and Tulipa lehmanniana (UzbRDB NT);;
 
Post-construction restoration via seeding, re-planting, and landscaping with native, 
high-value species such as Acanthophyllum cyrtostegium(UzbRDB VU), Calligonum 
zakirovii (UzbRDB EN), Eremurus korolkowii (UzbRDB VU), Ferula kyzylkumica (UzbRDB 
VU), and Tulipa lehmanniana (UzbRDB NT);.
As part of the pre-construction biodiversity management program, a Flora Conservation 
Action Plan will be prepared, which will outline the locations and timings of pre-construction 
flora surveys to be undertaken for the purposes of seed collection, demarcation of areas to 
be protected, and translocation of whole specimens if deemed feasible.
The Flora Conservation Action Plan will include the methodology for seed storage. Collected 
seeds shall be utilized during post-construction restoration, which shall be detailed in the 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   167   168   169   170   171   172   173   174   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling