Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
- Bu sahifa navigatsiya:
- Part B- Overhead Transmission Line
- Part C – Applicable to Both Wind Farm OHTL
Part A
– Wind Farm 7. Terrestrial Ecology (same structure for environmental parameters 8 to 15) Observation and Baseline Conditions Receptors Potential Impacts, Mitigations, Management Measures & Residual Impacts Monitoring 8. Air Quality Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 8 9. Noise and Vibration 10. Soil, Geology, Groundwater and Surface Water 11. Traffic and Transportation 12. Archaeology and Cultural Heritage 13. Landscape and Visual Amenity 14. Shadow Flicker 15. Socio-Economics 16. Stakeholder Engagement and Consultation Part B- Overhead Transmission Line 17. Terrestrial Ecology (same structure for environmental aspects 18 to 20 and 22 to 25) Observation and Baseline Conditions Receptors Potential Impacts, Mitigations, Management Measures & Residual Impacts Monitoring 18. Air Quality 19. Noise and Vibration 20. Soils, Geology, Groundwater and Surface Water 21. Electric Magnetic Field 22. Traffic and Transportation 23. Infrastructure and Utilities 24. Archaeology and Cultural Heritage 25. Landscape and Visual Amenity 26. Socio-Economics 27. Stakeholder Engagement and Consultation Part C – Applicable to Both Wind Farm & OHTL 28. Solid Waste and Wastewater Management 29. Resettlement Action Plan 30. Community Health, Safety & Security 31. Labour and Working Conditions 32. Influx Impact Assessment 33. Human Rights Impact Assessment 34. Climate Affairs 35. Cumulative Impacts 36. References Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 9 Volume 3 provides a framework for the development of the Construction & Commissioning and Operational Environmental and Social Management Systems (including associated system structures, documents and management plans) based on the findings from this ESIA. The intention is that this volume (alongside the full ESIA package and other E&S documents) will be issued to the EPC Contractor and O&M Company to develop and implement their project specific ESMS’ respectively. Volume 4 comprises Appendices which have been divided into three (3) parts and these are as follows: Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling