Dzhankeldy Wind Power Project


Download 6.64 Mb.
Pdf ko'rish
bet28/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   24   25   26   27   28   29   30   31   ...   203
Bog'liq
56086-001-esia-en

R22 
Mining area 7 - Inactive & Owner 
Unknown 
500m south of the eastern 
plot and 1.8km north of 
the western plot 
R23 
Mining area 8 
– An inactive mine owned 
by “Richland international Industry” LLC 
570 meters north of the 
western plot and 1.4km 
south of the eastern plot 
R24 
Mining area 9 - Inactive & Owner 
Unknown 
930m north of the western 
plot and 950m south of 
the eastern plot 
R25 
Temporary water body 
Agricultural 
320m south of the eastern 
plot
R26 
Livestock and other users of the 
temporary water body 
320m south of the eastern 
plot 
R27 
Livestock stable belonging to Herder 
Tolboy 
Within the eastern site 
R28 
Livestock stable belonging to Herder 
Bugibaev 
Within the eastern site 
R29 
Livestock stable belonging to Herder 
Yusupov
2 km north-west from 
Eastern Project site 
R30 
Livestock stable belonging to Herder 
Bekturganov 
Within the western Site 
R31 
Water well used by herders 
Within the western Project 
site 
Note: R 
– Receptor 
Note: 
The mining areas identified as “inactive” have been included as receptors because it is advised 
that there is the possibility for mining works to re-commence in the future. As advised by the State 
Committee on Geology and Mineral Resources, mining companies only commence mining activities 
after obtaining a licence from the State Committee and after securing funds required to start & 
complete mining works, purchase equipment & machinery. 
Summary of the consultation undertaken with the State Committee on Geology and Mineral 
Resources is presented in Chapter 10: Soils, Geology, Groundwater & Surface Water in Part A of this 
ESIA. 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   24   25   26   27   28   29   30   31   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling