Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
- Bu sahifa navigatsiya:
- Significance Threshold
particular resource. They represent issues where impacts will be experienced but mitigation measures and detailed design work may ameliorate or enhance some of the consequences upon affected communities or interests. Some residual impacts will still arise. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 123 S IGNIFICANCE C ATEGORY C RITERIA Slight Local issue unlikely to be of importance in the decision-making process. Impacts do not exceed statutory limits. Nevertheless, they are of relevance in enhancing the subsequent design of the project and consideration of mitigation or compensation measures. Neutral No impact or impact that is beneath the level of perception, within normal bounds of variation or within the margin of forecasting error. No mitigation is required. The approach to assigning significance of impact relies on reasoned argument, professional judgement and taking on board the advice and views of appropriate organisations. For some disciplines it is determined by comparison, wherever possible with company, locally, nationally or internationally accepted standards. If no standards are available then it is necessary to develop Project specific limits, based on guidance or best practice as necessary. Such standards or limits are referred to as the Significance Threshold. If the size and type of impact is greater that the significance threshold, then this is termed a Significant Impact. Potential significant impacts need to be avoided and are therefore prioritised identifying mitigation measures to reduce the impact to an acceptable level. Note: All predicted impacts with a beneficial impact have been colour coded green. 4.2.3 Mitigation and Management Measures The Project includes a variety of measures to ensure that environmental and social standards and guidelines can be achieved by the Project. The Project’s impact assessment process as outlined above will therefore take into consideration those measures included to the Projects design. In addition to specific measures included to the Projects design, the ESIA will outline further mitigation and/or management measures for the construction and the operational phases, upon which the Project can further minimise or avoid negative impacts and ameliorate positive impacts. Upon approval of the Project, the stated mitigation and management measures in the approved ESIA will be required for implementation as a condition of the environmental permit, or as the lenders as part of the loan agreement. 4.2.4 Residual Impacts Following assessment of the mitigation and management measures, the Projects residual impact significance will be considered to determine whether the proposed mitigation and management can be considered acceptable. The significance of such impacts is based upon the same criteria used to determine the impact significance before applying additional mitigation and management measures. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 124 4.2.5 E&S Disclosure In line with the EBRD, ADB and EPs requirements for consultations and disclosure, Project Information has been made available to the stakeholders and the general public at key stages of the ESIA assessment stages. The ACWA Power Dzhankeldy Wind Farm ESIA will undergo a 60-day disclosure period in accordance with the EBRD Environmental and Social Policy (2019) since the Project is an IPP and under the private sector and a 120-day disclosure period in accordance with the ADB Operations Manual as the Project falls under Category A of the environment safeguard. In addition to posting the ESIA on ACWA Power’s website, ESIA disclosure through public consultation meetings (in line with Covid-19) and the distribution of Project leaflets and brochures will be undertaken (public assembly is restricted due to Covid-19). The purpose of these meetings will be to invite the different stakeholders to present an overview of the Project, and the Environmental & Social assessment process undertaken; and to receive comments/feedback from the public (particularly the comments by the communities likely to be affected by the implementation of the Project), which will be incorporated to finalise the ESIA document. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 125 5 S TANDARDS AND R EGULATORY R EQUIREMENTS Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling