Table of contents introduction


Download 263.72 Kb.
bet35/77
Sana22.11.2023
Hajmi263.72 Kb.
#1794484
1   ...   31   32   33   34   35   36   37   38   ...   77
Bog'liq
Тех процес 1 INGLIZCHA

Appendix 10. Instructional and technological map of the STC operator for processing arriving trains.
Appendix 11. Instructional and technological map of the STC operator for departure.

Appendix 12. Instructional and technological map of the head of the station technological center of Chukursay station.
Appendix 13. Instructional and technological map of labor organization RSDV.

Appendix 14. Instructional and technological map of the senior commodity cashier and commodity cashier.
Appendix 15. List of access roads and their junction points.
Applications 1

INSTRUCTIONAL AND TECHNOLOGICAL CARD OF THE STATION MANAGER (DSP-1 and DSP-2).



1. Initial data.

1.1. Work in progress .


Ensure the reception, departure and passage of trains at the station. Establishes the procedure for the movement of trains during a break in all means of signaling and communication with the preparation of documents. Submits trains for technical and commercial inspections and monitors their readiness upon arrival and departure. He is one of the shift leaders. In the absence of one of the dispatchers, the shunting dispatcher temporarily performs the duties of the absent dispatcher.


1.2. Form of labor organization.
Part of a single shift.

1.3. Labor rationing.
Number of wagons sent from the station . Downtime of a transit car with processing. Number of recycled cars at the hump. Departure of CIS wagons.


1.4. Salary.
Time-based bonus. Bonus in accordance with the Regulations on bonuses in force at the station.


2. Organization of the labor process
2.1. Planning.


Download 263.72 Kb.

Do'stlaringiz bilan baham:
1   ...   31   32   33   34   35   36   37   38   ...   77




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling