Table of contents introduction


Plan name From whom and when does the plan come?


Download 263.72 Kb.
bet36/77
Sana22.11.2023
Hajmi263.72 Kb.
#1794484
1   ...   32   33   34   35   36   37   38   39   ...   77
Bog'liq
Тех процес 1 INGLIZCHA

Plan name

From whom and when does the plan come?

How to get a plan

station work plan for shift

From the station management before going on duty

Personally

Plan of train shunting operation of the station in 4-hour periods

From the train dispatcher to the start of the planning period and the hump duty officer

By phone in person, or through an operator at the DSP



2.2. Reception duty.
Before taking duty, he must undergo current instruction on labor protection and sign in the TNU-19 log from the station managers. Performs acceptance and delivery of shifts (together with the employee handing over and accepting the shift).
Gets acquainted with the plan for the upcoming work for the shift and the next 4 hours, guidelines and orders for operational work and safety of train traffic, the presence of valid warnings, the contents of previous records of faulty tracks, switches and signaling devices. Checking the signaling equipment in the premises of the station duty officer, seals according to the inventory, time of arrival on duty, positions on the tracks of the station park.

2.3. Responsibilities of the station duty officer during duty:


- ensures safe reception, departure and passage of trains through the station;
- performs operations to prepare routes for receiving and departing trains;
- reception and departure, passage of trains is organized in agreement with train dispatchers, duty officers at the Keles and Salar stations in accordance with the instructions for train movement, the technical and distribution act of the Chukursay station.
- monitors the work of the operator with the station duty officer, recording entries in the DU-58, DU-60 logs;
- monitors the operation of signaling and communication devices at the station, maintains a log of signaling and communication f. DU-46 in accordance with the instructions NSh 4397;
- ensures the implementation of the technological process of the station when processing trains upon arrival and departure;
- monitors the work of duty officers at reception, departure and sorting parks;
- exercises control over the timely issuance of warnings on trains, registration of entries in the warning log f. DU-60;
- during work, the station duty officer notifies workers on the tracks via loudspeaker about the upcoming arrival and departure of trains, as well as about shunting movements at the station;
- for expedited processing of the train, prepares the receiving route in advance, ensuring traffic safety, labor protection, after the train leaves the neighboring station, notifies the car maintenance and technical office workers about the train number, the receiving route and the time of its arrival;
- after stopping the train, securing it from leaving in accordance with clause 3.10. TPA station, uncoupling the locomotive and removing it from the track, the station duty officer, together with the PTO operator from the control panel, protects this path;
- after receiving a message from the hump duty officer about the completion of the formation of the train, the station duty officer controls the accelerated processing of the train and presents the train to the PTO operator for commercial and technical inspection, indicating the track number, the number of cars in the train, head and tail cars, together with the PTO operator protects the way:
At the end of duty. Accurately and clearly informs the station duty officer who is on duty about the arrival of trains, outstanding work, the situation at the station, and new orders.



Download 263.72 Kb.

Do'stlaringiz bilan baham:
1   ...   32   33   34   35   36   37   38   39   ...   77




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling