- Labor Code of the Republic of Uzbekistan;
- orders, instructions from management, the company's management and station management on train movement, shunting work and safety precautions;
- plan, profile, capacity and specialization of tracks in the sorting park;
- design and malfunctions of turnouts, as well as the rule for translating turnouts using a courbel;
- oversized spaces throughout the station specified in the TPA;
- norms and rules for calculating the fastening of trains with brake shoes.
- sorting hump devices, the operating principle of hump centralization devices and the rules for using these devices;
- driving performance of rolling stock;
- plan for the formation of freight trains;
- instructions for ensuring the safety of train traffic during track work;
- charter on discipline of railway transport workers.
For violation of his official duties he bears full responsibility in accordance with the employment contract.
Applications 5
INSTRUCTIONAL AND TECHNOLOGICAL MAP of the departure park DSPP (DSPP-3).
1. Initial data.
1.1. Work performed (As directed by DSP-2).
Provides securing of rolling stock on the tracks of the departure park. Removing brake shoes from under completed trains before departure. Delivery of warnings to trains (DU-60, DU-61). Maintains technical documentation.
1.2. Form of labor organization.
Part of a complex team. Operatively subordinate to the DSP (station duty officer).
1.3. Labor rationing.
Downtime of a transit car with processing. Number of wagons sent.
1.4. Salary.
Time-based - bonus. Bonus in accordance with the Regulations on bonuses in force at the station.
2. Organization of the labor process.
Do'stlaringiz bilan baham: |