Tcrv ta 8799 ind supporting Public–Private Partnerships for Infrastructure Development


The design and monitoring framework is in the technical assistance report. 2


Download 381.52 Kb.
Pdf ko'rish
bet13/15
Sana23.12.2022
Hajmi381.52 Kb.
#1048547
1   ...   7   8   9   10   11   12   13   14   15
Bog'liq
hindiston

 
The design and monitoring framework is in the technical assistance report.
2
 
Planned and Actual Achievements of the Technical Assistance 
Performance 
Indicators 
Planned 
Actual 
Reasons for Variance 
Outcome 
Improved public 
sector capacity to 
develop and 
implement 
infrastructure 
PPP projects 
a. By 2020, “3P India” (a 
proposed institution for 
supporting PPPs) fully 
operational in supporting 
mainstreaming of PPPs 
b. By 2019, at least one 
bankable pipeline PPP 
project from each of the 
assisted prototype PPP 
cells proposed or 
prepared. 
c. By 2019, at least 70% of 
surveyed sponsoring 
authorities indicate 
expedited creation of 
pipeline for bidding out 
or structuring projects
.
a. Not achieved. In the 
FY2014–2015 budget, 
the government 
announced the 
establishment of 3P India, 
but it was not 
implemented within the 
duration of the TA. 
b. Not achieved. The 
prototype PPP cells were 
not established. 
c. Not achieved. Survey 
could not be conducted 
for sponsoring agencies 
to establish outcome 
achievement
.
a. Due to delays in the 
establishment of 3P 
India by the 
Government of India.
b. Partly due to delays 
in the approval of 
experts under the 
consultancy contract, 
but also due to early 
withdrawal of two 
experts the 
replacement for 
which could not be 
found and mobilized 
by the consultancy 
firm. 
c. The TCR did not 
provide a clear 
explanation as to why 
the survey could not 
be conducted. 
Output 1
Transition to 3P 
India supported 
1a. By 2019 plan for 
support to 3P India 
delivered. 
1a. Partly achieved. In 
the FY2014–2015 
budget, the government 
announced the 
establishment of 3P India. 
A draft plan as a Cabinet 
proposal, detailing 
functions, structure, 
1a. A draft plan was 
prepared, but the 
establishment of 3P 
India could not be 
completed within the TA 
period. 
1
Asian Development Bank (ADB). 2021. 
Technical Assistance Completion Report:
 
Supporting Public–Private 

Download 381.52 Kb.

Do'stlaringiz bilan baham:
1   ...   7   8   9   10   11   12   13   14   15




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling