The part of land in Peshku district where Dzhankeldy-Bash OHTL is planned has been allocated 
to “ACWA Power Dzhankeldy Wind” LLC for the construction of WF.
K
ONIMEKH 
D
ISTRICT
 
The Dzhankeldy-Bash OHTL alignment within their district is within the territory of Forestry Fund. 
A section of this land belongs to the Qaraqo’ta LLC (see blue line in figure below) who leases 
the land from the Committee for the Development of Sericulture and Wool Industry. 
 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
43 
Figure 2-9 Dzhankeldy-Bash OHTL Alignment Within Konimekh District (Ref. Blue Line 
for Section Leased by Qaraqo’ta LLC)
 
2.2.2.2
Land Lease 
As earlier discussed, ACWA Power will transfer the operation of the OHTL to NEGU after 
completion of the construction phase. As such, ACWA Power will only be granted land usage 
rights during the construction phase of the OHTL and the required land will be allocated to 
NEGU on a permanent basis through a government decree. It is understood from the Client 
that the allocation of land to NEGU will be undertaken once the required land is taken into 
state reserve. This process is still ongoing. 
2.2.2.3
Land Use and Site Condition 
As observed during a site reconnaissance visit undertaken in April and May 2021, the 128.5km 
OHTL route is located in the central part of the Kyzylkum desert and lies on the flat part of the 
northern foothills of the Kuljuktau Range. From the Project site, this proposed OHTL route runs 
along/parallel to a local asphalt road (called Zarafshan-Navoi road) that connects the village 
of Dzhankeldy to the village of Chontabay, Chengeldy, Karakata and Baloakarak 
approximately 140m, 3.7km, 6.1km and 10km north of the OHTL respectively.
Where the local asphalt road ends, the proposed OHTL route runs further across the hills from 
the Darbaza to the Kafirtepa Hill after which it crosses and runs parallel to an existing 220kV 
high voltage transmission line that runs through the Bash site from north to south east. The 
proposed OHTL also crosses the Navoi-Uchkuduk railway that runs through the Bash site. 
 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
44 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   28   29   30   31   32   33   34   35   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling