Dzhankeldy Wind Power Project


Download 6.64 Mb.
Pdf ko'rish
bet83/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   79   80   81   82   83   84   85   86   ...   203
Bog'liq
56086-001-esia-en

N
AME
 
R
OLE WITHIN 
ESIA 
Ken Wade 
Project Director 
Eva Muthoni Kimonye 
Project Manager and ESIA Specialist 
Max Burrow 
ESIA Specialist 
Eniola Oladimeji 
ESIA Specialist 
Nicholas Meyer 
ESIA Specialist 
Lara Bou Ghanem 
ESIA Specialist 
Sonya Benjamin 
Biodiversity, Ecological & Avifauna Expert 
International Specialists 
Dr. Sunil Patel (ENTRAN) 
Noise and Shadow Flicker Specialist


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
116 
N
AME
 
R
OLE WITHIN 
ESIA 
Valentin Soldatov 
Houbara Bustard & Endangered Species 
Expert 
Timur Abduraupov
Herpetologist & Biodiversity Expert 
Mariya Gritsina 
Bat Expert 
Denis Vasenkov 
Bat Signal Analysist 
Elena Bykova 
Mammal Expert 
Natalya Beshko 
Botanist 
Alexander Esipov 
Mammal Expert 
Askar Akhmedov 
Invertebrates Expert 
Table 4-3 Institute of Archaeology Experts involved in the Project 
N
AME
 
R
OLE WITHIN 
ESIA 
Sayfullayev B.Q. 
Head of expedition 
Khoshimov Kh.B. 
Senior researcher 
Ergashev O.T. 
Senior researcher 
Radjabov A.Y. 
Senior researcher 
Mukhtorov G. 
Senior researcher 
Omonov A.M. 
Senior researcher 
Inomov A.A. 
Intern Researcher 
Elmurotov B.A. 
Senior researcher 
Berdikulov M.T. 
Senior researcher 
4.2
ESIA Methodology
This section provides information about the data collection and consultation process 
undertaken to inform the ESIA and the methodology that has been used to describe the 
sensitivity of environmental and social receptors; predict the magnitude of environmental and 
social impacts and assess the significance of impacts upon applicable environmental 
parameters.
4.2.1 
Baseline Studies and Research
Forming an integral part of the ESIA, the baseline surveys provide a benchmark of the existing 
conditions by which the potential impacts of the proposed project can be assessed for the 
construction and operational phase. 
This ESIA has been informed by a review of relevant desktop information as well as a series of 
physical site surveys which have been summarised in the relevant environmental and social 
impact assessment chapters of this report. The environmental baseline surveys carried out as 
Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   79   80   81   82   83   84   85   86   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling