W
ASTEWATER
 
EBRD 
EBRD PR3 on Resource Efficiency and Pollution Prevention and Control establishes general 
requirements for wastewater management as follows: 
 
The Project must seek to minimise water usage in order to minimise wastewater 
generation; and 
 
The Project must identify technically and financially feasible techniques for reusing 
and recycling effluents in accordance with GIP, which should be implemented as 
part of the project design. 
5.13
Resettlement Action Plan 
5.13.1 
National Regulations 
L
AND 
R
IGHTS
,
 
A
CQUISITION AND 
R
ESETTLEMENT
 
 
Civil Code of the Republic of Uzbekistan “Civil code” (№ 163- I, 21.12.1995, as 
amended on 22.01.2020); 
 
Land Code (19
98 as amended 2010) (№ 598-I, 30.04.1998, as amended on 
28.08.2019); 
 
Law of the Republic of Uzbekistan on State Land Cadastre No.666-I of 28.08.1998 
 
Presidential Decree № UP-5742 "On Measures for The Efficient Use of Land and 
Water Resources in Agriculture" 
 
Resolution № 146 of the Cabinet of Ministers “On the Procedure for Compensation 
for Losses of Land Owners, Users, Tenants and Owners, As Well As Losses Of 
Agricultural And Forestry Production”.
 
San Rules & Norms No. 0236-
07 “Sanitary norms and rules to ensure safety for 
people living near high voltage power transmission lines, 2007”. 
 
Sanitary Rules & Norms on Hygienic Standards: SanPiN No 0350-
17 “Sanitary norms 
and rules on atmospheric air protection in populated areas of the Republic of 
Uzbekistan” This standard establishes sizes of the sanitary protection zones for OHTLs 
in order to protect the public from the effects of the electric field created by 
OHTLs.. In the case of the Dzhankeldy Project the size of the sanitary protection 
zone should be at least 30m on both sides of the 500kVOHTL. 
5.13.2 
Lender Requirements 
At this stage, it is understood that the EBRD and ADB are involved in discussions relating to 
provisions of finance. As a result, the project will be required to adhere to the following lender 
requirements in regard to involuntary land acquisition: 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
152 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   111   112   113   114   115   116   117   118   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling