Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
- Bu sahifa navigatsiya:
- AMENDED IN 2019
E
QUATOR P RINCIPLES G UIDANCE ON I MPLEMENTATION OF THE E QUATOR P RINCIPLES D URING THE C OVID -19 P ANDEMIC The guidance recommends that the borrower should communicate information to local comm unities on the Project’s response to Covid-19 including control of work-force community interactions, any necessary changes to procedures, the project approach to controlling COVID-19 risks in the workforce and any aspects of support being offered by the Project to the local community. This should include the review of appropriate stakeholders and include a focus on any identified vulnerable groups. The guidance recommends the following alternative engagement processes: Consideration of opportunities for engagement through local actors such as women, youth, leaders, local authorities, traditional leaders etc. Implementation of additional training for Community Liaison Officers to ensure they can effectively deliver key messages, particularly to the most the most vulnerable and where Project impacts will be significant. The engagement should be mindful of managing social stigma of COVID-19 and consider alternative methods that ensure anonymity. 5.12 Solid Waste & Wastewater Management 5.12.1 National Requirements T HE L AW OF THE R EPUBLIC OF U ZBEKISTAN “O N W ASTES ” (2002) AMENDED IN 2019 The principle objective of this law is to prevent the negative impacts of solid wastes on human lives and health as well as the environment, reduce waste generation and encourage rational use of waste reduction techniques. Article 19 Provided generated waste is subject to export and import operations, or hazardous waste is subject to transportation, an environmental certification procedure shall be completed by the Project to confirm compliance with sanitary and environmental norms and standards associated with waste management. Article 20 states that transportation of hazardous waste shall be in specially designated types of vehicles with a waste certificate and permit. The responsibility for safe transportation of hazardous waste shall be with the transporting organisation. Article 22 of the Law on Wastes specifies the general requirements for waste storage and disposal. Waste disposal of recyclable waste is prohibited in Uzbekistan. In addition, storage Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 149 and disposal of waste in the environment including in nature conservation and protected areas, settlements, health and recreational areas or historical and cultural facilities is prohibited. Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling