Dzhankeldy 500MW Wind Farm
ESIA Volume 2- Main Text, Tables & Figures
231
Table 7-15 Significance of Earthworks Mortality
R
ECEPTOR
V
ALUE
/
S
ENSITIVITY
M
AGNITUDE
S
IGNIFICANCE
Non-threatened
Mammals
Low / Lower
Major
Minor to
moderate
Southern Even-fingered Gecko
Very High
Major
Major
Russian
Tortoise
High
Major
Major
Nationally Important Herptiles
Medium
Major
Moderate to
Major
Non-threatened Herptiles &
Invertebrates
Low / Lower
Major
Minor to
moderate
However, the following mitigation measures shall be implemented to reduce the impacts on
floral species:
Pre-construction survey to carry out in-situ protection where possible, and whole-
specimen translocation (during
the peak spring season, chiefly March) for
threatened flora;
Seed-collection of endangered, threatened and near threatened flora (during the
peak season, chiefly March) such as
Acanthophyllum cyrtostegium(UzbRDB VU),
Calligonum zakirovii (UzbRDB EN),
Eremurus korolkowii (UzbRDB VU),
Ferula
kyzylkumica (UzbRDB VU), and
Tulipa lehmanniana (UzbRDB NT);;
Post-construction restoration via seeding,
re-planting, and landscaping with native,
high-value
species such as Acanthophyllum cyrtostegium(UzbRDB VU),
Calligonum
zakirovii (UzbRDB EN),
Eremurus korolkowii (UzbRDB VU),
Ferula kyzylkumica (UzbRDB
VU), and
Tulipa lehmanniana (UzbRDB NT);.
As part of the pre-construction biodiversity
management program, a
Flora Conservation
Action Plan will be prepared, which will outline the locations and timings of pre-construction
flora surveys to be undertaken for the purposes of seed collection, demarcation of areas to
be
protected, and translocation of whole specimens if deemed feasible.
The Flora Conservation Action Plan will include the methodology for seed storage. Collected
seeds shall be utilized during post-construction restoration, which
shall be detailed in the