LECTRICAL S UPPLY & F UEL It is anticipated that diesel electric power generators will be used as the source of electricity during construction and as backup. Currently, it is estimated that the total electricity consumption during the construction phase will be approximately 6,605,515.20 kw/h. It is estimated that about 10,500 litres of diesel will be used per month. However it should be noted that the total electricity consumption and quantity of diesel to be used per month has not been confirmed by the EPC Contractor. W ATER S UPPLY During site preparatory stage, the project will require potable water supply for the construction facilities & activities. The expected volume of water for construction activities in approximately 30,000m 3 . It is anticipated that project personnel will use approximately 80,000m 3 of water. A licensed potable water supply company will supply the water required to cover the water demand of the Project (both for construction activities and for use by project personnel) to the site via water tanker trunks. S ANITARY F ACILITIES The site will require on site sanitation facilities for the construction workers (expected to be toilets and washrooms with collection septic tanks). Sanitary wastewater will be stored in bunded septic tanks on-site, prior to removal by a licensed contractor for treatment at licensed facilities off-site. 2.4.4 Workforce Requirements for construction workforce are yet to be finalised. At this stage it is understood that about 700-1000 personnel will be involved during peak construction periods of the Wind Farm and OHTL (about 50-100 personnel will be involved in the OHTL construction). This will comprise a combination of Project Company, EPC Contractor and sub-contractor staff. Out of these 700-1000 personnel, about 350 - 500 will be employed from the local workforce and female workers will make up about 5% of the total workforce i.e. 35 – 50 female workers. The figure below provides the indicative organizational chart of the EPC Contractor. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 75 Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling