Project Construction Requirements 2.4.1 Primary Construction Works 2.4.1.1 Wind Farm Principle construction activities and associated requirements in relation to civil works are anticipated to include but not limited to; Detailed project planning, design and consideration of wind farm components by the EPC Contractor; Transportation of wind farm components to the project site; Delivery of machinery & equipment to the site Site preparation (comprising excavation, grading, levelling, and land clearing at WTG platforms) to create flat land area for preparation of turbine pads, installation of wind turbine towers and various project components; Additional facilities to facilitate construction work (comprising excavation and levelling etc.) for access road, internal road network, construction of any building infrastructure (if required); Construction of temporary laydown facilities and building site equipment (e.g. containers at the Project site); Installation of permanent meteorological towers (as necessary); Provision of electricity supply, generation and distribution system as required for installation, erection; Commissioning tests of electrical infrastructure (including wind turbine generators) and inspection of civil engineering quality records. 2.4.1.2 OHTL Site preparation (comprising excavation, grading, levelling, and land clearing at tower footprint & access roads from nearby road to OHTL corridor or Right of Way (ROW)); Transportation and delivery of equipment/machinery and OHTL components; Construction of platforms for pylons/towers and delivery of materials along OHTL route; Construction of temporary laydown areas (if to be located along OHTL corridor); Assembly of OHTL towers/pylons; Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 73 Constructing electrical substations, Installation & erection of OHTL towers/pylons, installation and laying of wires & transmission cables on pylons, connecting wires and cables, stringing of conductors, tensioning and sagging of conductors, etc. Provision of electricity supply, generation and distribution system as required for installation, erection, etc. 2.4.2 Temporary Construction Facilities Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling