Dzhankeldy Wind Power Project


Project Construction Requirements


Download 6.64 Mb.
Pdf ko'rish
bet50/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   46   47   48   49   50   51   52   53   ...   203
Bog'liq
56086-001-esia-en

2.4
Project Construction Requirements 
2.4.1 
Primary Construction Works 
2.4.1.1
Wind Farm 
Principle construction activities and associated requirements in relation to civil works are 
anticipated to include but not limited to
 
Detailed project planning, design and consideration of wind farm components by 
the EPC Contractor;
 
Transportation of wind farm components to the project site; 
 
Delivery of machinery & equipment to the site 
 
Site preparation (comprising excavation, grading, levelling, and land clearing at 
WTG platforms) to create flat land area for preparation of turbine pads, installation 
of wind turbine towers and various project components; 
 
Additional facilities to facilitate construction work (comprising excavation and 
levelling etc.) for access road, internal road network, construction of any building 
infrastructure (if required);
 
Construction of temporary laydown facilities and building site equipment (e.g. 
containers at the Project site); 
 
Installation of permanent meteorological towers (as necessary); 
 
Provision of electricity supply, generation and distribution system as required for 
installation, erection; 
 
Commissioning tests of electrical infrastructure (including wind turbine generators) 
and inspection of civil engineering quality records. 
2.4.1.2
OHTL 
 
Site preparation (comprising excavation, grading, levelling, and land clearing at 
tower footprint & access roads from nearby road to OHTL corridor or Right of Way 
(ROW)); 
 
Transportation and delivery of equipment/machinery and OHTL components
 
Construction of platforms for pylons/towers and delivery of materials along OHTL 
route; 
 
Construction of temporary laydown areas (if to be located along OHTL corridor); 
 
Assembly of OHTL towers/pylons; 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
73 
 
Constructing electrical substations, Installation & erection of OHTL towers/pylons, 
installation and laying of wires & transmission cables on pylons, connecting wires 
and cables, stringing of conductors, tensioning and sagging of conductors, etc. 
 
Provision of electricity supply, generation and distribution system as required for 
installation, erection, etc. 
2.4.2 
Temporary Construction Facilities 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   46   47   48   49   50   51   52   53   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling