Figure 2-23 Location of OHTL & substation


Download 6.64 Mb.
Pdf ko'rish
bet46/203
Sana13.09.2023
Hajmi6.64 Mb.
#1676820
1   ...   42   43   44   45   46   47   48   49   ...   203
Bog'liq
56086-001-esia-en

Figure 2-23 Location of OHTL & substation 
The 500kV single circuit OHTL from Dzhankeldy to Bash will connect to the Bash 500kV pooling 
switch sub-station. The switchyard will be designed to accommodate planned 
interconnections from Navoi-Muruntau LILO and the line from Sarymay to Dzhankeldy as shown 
in the figure below. 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
66 
Figure 2-24 Grid Interconnection Option for 1GW ACWA Wind Farms (Dzhankeldy & 
Bash)
Source: Selection of Interconnection Option
Note: The length of the OHTLs shown in the figure above has since been revised and the figure 
above is meant to show the interconnectedness between the Dzhankeldy & Bash Projects and 
the OHTL associated facilities. 
Power generated by the wind farms will be exported to NEGU via the plant electrical 
interconnection facilities/500kV AIS of One and Half Breaker Scheme. Preliminary details of the 
Air Insulated Substation (AIS) is shown in the figure below and in Appendix G. 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
67 
Figure 2-25 Proposed Arrangement for AIS 
 
Source: ACWA Power 2021 
The 500kV unit bay for the Dzhankeldy and Bash Wind Farm will comprise of
 
Circuit breaker; 
 
Isolator; 
 
Earthing; 
 
Switches, 
 
Measuring CTS & amp; 
 
Protection relays and associated control 
Both the AIS for the Dzhankeldy and Bash Wind Farm will be designed for 500kV level and will 
employ one and half breaker scheme. It is understood from ACWA Power that the Bash 500kV 
pooling switch sub-sta
tion will be operated by both the FE “ACWA Power Dzhankeldy Wind” 
LLC and FE “ACWA Power Bash Wind” LLC. To allow independent project implementation, the 
AIS at Bash Wind Farm will be equipped with section disconnector that will be connected after 
commissioning both Wind Farms. 


Dzhankeldy 500MW Wind Farm 
ESIA Volume 2- Main Text, Tables & Figures 
68 

Download 6.64 Mb.

Do'stlaringiz bilan baham:
1   ...   42   43   44   45   46   47   48   49   ...   203




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling